Here is a list of important 395 transaction codes used with SAP PP-MRP component (SAP Material Requirements Planning – PP) coming under SAP PP Module . You will get more technical details of each of these SAP PP-MRP tcodes by clicking on the respective tcode name link.
Include Material in Classic MRP
MRP RunMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Planning → Total Planning → Online
MRP – Single-item, Multi-level –Menu Path : Logistics → Production → MRP → Planning → Single-Item, Multi-Level
MRP-Individual Planning-Single LevelMenu Path : Logistics → Production → DRP → Planning → DRP run → Material
Display Stock/Requirements SituationMenu Path : Logistics → Logistics Execution → Information System → Goods receipt → Lists for Material Stock → Current Requirements and Stock List
Individual Display Of MRP ListMenu Path : Logistics → Project System → Material → Planning → MRP List → Individual Display
Collective Display Of MRP ListMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Evaluations → MRP List – Coll. Displ.
Current Material OverviewMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Evaluations → Stock/Requirements: Collective Display
Reorg. MRP ListsMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Environment → Reorg. MRP Lists
PeggingMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Evaluations → Pegged Requirements
Create Planned OrderMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Planned Order → Create
Change Planned OrderMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Planned Order → Change
Display Planned OrderMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Planned Order → Display → Individual Display
Individual Conversion of Plnned Ord.Menu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Planned Order → Convert to Pur. Req. → Individual Conversion
Collective Conversion Of Plnd Ordrs.Menu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Planned Order → Convert to Pur. Req. → Collective Conversion
Collective Display of Planned OrdersMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Planned Order → Display → Collective Display
Collective Requirements DisplayMenu Path : Logistics → Production → Repetitive Manufacturing → Evaluations → Total Requirements
Firm Planned OrdersMenu Path : Logistics → Production → Production Planning → MPS → Planned Order → Firm
Create Planning File EntryMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Planning → Planning File Entry → Create
Display Planning File EntryMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Planning → Planning File Entry → Display
Create Planning CalendarMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Master Data → Planning Calendar → Create Periods
Change Planning CalendarMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Master Data → Planning Calendar → Change Periods
Display Planning CalendarMenu Path : Logistics → Production → Production Planning → Demand Management → Environment → Planning Calendar → Display Planning Calendar
MPSMenu Path : Logistics → Production → Production Planning → MPS → MPS → Total Planning → Online
MPS – Single-item, Multi-level –Menu Path : Logistics → Production → Production Planning → MPS → MPS → Single-Item, Multi-Level
MPS – Single-item, Single-level –Menu Path : Logistics → Production → Production Planning → MPS → MPS → Single-Item, Single-Level
MPS – Single-item, Interactive –Menu Path : Logistics → Production → Production Planning → MPS → MPS → Single-Item, Interactive
MPS EvaluationMenu Path : Information Systems → General Report Selection → Materials Management → Inventory Management → Inventory Information Systems → Material → MPS Evaluation
MRP List EvaluationMenu Path : Information Systems → General Report Selection → Production Planning → Production Planning → Master Production Scheduling → MRP List Evaluation
Eval. MRP lists of MRP controllerMenu Path : Logistics → Production → Production Planning → MPS → Evaluations → Planning Result Collective Display
Product Group Planning EvaluationMenu Path : Information Systems → General Report Selection → Materials Management → Consumption-Based Planning → Product Group Planning Evaluation
Cross-Plant EvaluationMenu Path : Logistics → Production → Production Planning → MPS → Evaluations → Situation – All Plants
Multilevel Order ReportMenu Path : Logistics → Production → Production Planning → Demand Management → Evaluations → Order Report
Sales order planningMenu Path : Logistics → Project System → Material → Planning → MRP Sales Order
Individual project planningMenu Path : Logistics → Project System → Material → Planning → MRP Project
Maintain Number Range for MRP
Maintain No. Range for Planned Order
Maint.No.Range for Reserv/Dep.Reqmt
Maintain Number Range: MDSM
Number range maint.: Total reqs
Planning File – Set Up BATCHMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Planning → Planning File Entry → Set Up in Background
Execute Action for Planned OrderMenu Path : Logistics → Production → Production Planning → MPS → Planned Order → Execute Action
BAPI planned order processing
MPS – total planning runMenu Path : Logistics → Production → Production Planning → MPS → MPS → Total Planning → As Background Job
MRP Run In BatchMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Planning → Total Planning → As Background Job
Start MD07 by using report
Evaluation Report RoCs Online
Evaluation Report Ranges of Coverage
Create Production LotMenu Path : Logistics → Production → MRP → Master Data → Production Lot → Create
Change Production LotMenu Path : Logistics → Production → MRP → Master Data → Production Lot → Change
Display Production LotMenu Path : Logistics → Production → MRP → Master Data → Production Lot → Display
Print MRP ListMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Evaluations → Print of MRP List
Workflow: Mail to MRP Controller
Calculation of Multilevel Delay
Checking Plnng File In BCKGRND ModeMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Planning → Planning File Entry → Consistency Check
Display Serial NumbersMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Master Data → BOM Explosion Number → Display
Change BOM Explosion NumbersMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Master Data → BOM Explosion Number → Edit
Convert Planned Orders into PReqsMenu Path : Logistics → Production → MRP → Planned Order → Convert to Pur. Req. → In Background
Maintain Project New Key AssignmentMenu Path : Logistics → Production → MRP → Master Data → Project Assignment → Edit
Assign New Key to WBS ElementsMenu Path : Logistics → Production → Production Planning → MPS → Master Data → Project Assignment → Display
Access MRP control program
Create message for direct production
Change Message for direct production
Display message – direct production
Long-Term Planning: Total PlanningMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Long-term planning → Planning run → Online
Long-term plng: single-itm, mult-lvlMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Long-term planning → Sng-item, multi-lvl
Long-term plng: singl-itm, singl-lvlMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Long-term planning → Sng-item, sng-level
Planning Scenario: Stock/Reqmts ListMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Evaluations → Stock/reqmts list
Long-term planning: display MRP listMenu Path : Information Systems → General Report Selection → Production Planning → Production Planning → Long-Term Planning → Long-Term Planning: Display MRP List
Long-term plnng: collective MRP listMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Evaluations → MRP List – Collective Display
Long-Term Plng: Material OverviewMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Evaluations → Stock/Requirements: Collective Display
Reorg.MRP Lists for Long-Term PlnngMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Environment → Reorg. MRP lists
LTP: Create planned orderMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Long-term planning → Simulative planned order → Create
LTP: Change planned orderMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Long-term planning → Simulative planned order → Change
LTP: Display planned orderMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Long-term planning → Simulative planned order → Display
Planning File Entry: Long-Term PlnngMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Long-term planning → Planning file entry → Create
Planning File Entry: Long-Term PlnngMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Long-term planning → Planning file entry → Display
Set Up Plg File Entries for ScenarioMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Long-term planning → Planning file entry → Set up scenario → Online
Delete Plng File Entries of ScenarioMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Long-term planning → Planning file entry → Delete scenario → Online
Calculate Sim. Initial StockMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Long-term planning → Average plant stock
Create planning scenarioMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Planning scenario → Create
Change planning scenarioMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Planning scenario → Change
Display planning scenarioMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Planning scenario → Display
Flexible Evaluation Long-Term PlnngMenu Path : Information Systems → General Report Selection → Production Planning → Production Planning → Long-Term Planning → Flexible Evaluation Long-Term Planning
Evaluation LTP for Product GroupMenu Path : Information Systems → General Report Selection → Production Planning → Production Planning → Long-Term Planning → Evaluation LTP for Product Group
Make-to-order planning (LTP)Menu Path : Logistics → Production → Production Planning → Long-Term Planning → Long-term planning → Sng-item, sales ord.
Project planning (LTP)Menu Path : Logistics → Production → Production Planning → Long-Term Planning → Long-term planning → Sng-item, project
LTP: set up plnng file entries BATCHMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Long-term planning → Planning file entry → Set up scenario → As background job
LTP: delete plnng file entries BATCHMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Long-term planning → Planning file entry → Delete scenario → As background job
Long-term plng:plng background jobMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Long-term planning → Planning run → As background job
LTP Evaluation Report RoC Online
LTP Evaluation Report Coverages
EKS Simulation: Material Selection
Print MRP List; Long-Term PlanningMenu Path : Logistics → Production → Production Planning → Long-Term Planning → Evaluations → Print MRP list
Storage Mode for MRP Lists
Period Profile for Safety Time
Convert MDVM/MDVL for MRP Areas
Declaration Selection Rule
Declaration Display Filter
Define Navigation Profile
Texts for Exception Groups
Define MRP ViewsMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Environment → Current Settings → Define MRP Views
Activate Parallel Reading of SRLMenu Path : Logistics → Production → MRP → Environment → Current Settings → Activate Parallel Import of Stock/Requir
Evaln Profile Ranges of Coverage
Activate Material Groupings
C RM-MAT MRP ControllersMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Environment → Current Settings → Define MRP Controllers
C RM-MAT MD Mat.type/MRP procedure
C RM-MAT MD Weighting Groups
C RM-MAT MD Exception Message T458A
C MM MRP Element Description T457
C RM-MAT MD Rqmts Plng Active T001W
C RM-MAT MD Schedul.Parameters T399D
C RM-MAT MD Control Parameters T438M
C RM-MAT MD Spec.Procurmt.Key T460A
C RM-MAT MD Period Split T449A
Marking Material for MRP Termination
C RM-MAT MD Planned Orders T436A
C RM-MAT MD Planned Ord. Types T460C
C RM-MAT MD Lot Sizes T439A
C RM-MAT MD StgeCosts Lot Size T439L
C RM-MAT MD Ord.ForecastRequmt T439P
C RM-MAT MD Plnned Order Types T460D
C RM-MAT MD Lot Size Texts
C RM.MAT MD Corr.Factors for Forcast
C RM-MAT MD Error Allocation
C MM-MRP No.RangeInterval – PurReq.
Check Consistency for Planning File
C MD Number of Planned Orders
C MM-MRP External Procurement
C MD Convert Planning Run
C MD MRP Creation Indicator
C MM-MRP Number Ranges: Mat. plg.
C MM-MRP No. Ranges for Pld Ords
C MM-MRP No. Ranges for Pld Ords
PP MRP C Direct Procurement
C MRP Range of Coverage Profile
C MRP Start Times – Background Jobs
MatMasterCust.:Batch Job Start Times
MRP Group per Material Type
Check. rule for updating backorders
Control of CO Integration
Sel. Receipt Elements for Coverage
Firming Scheduling Agreements
Screen Seq. MRP List ; Ext.Header
Reference Plant for MRP Master Data
Destinations Parallel MRPMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Environment → Current Settings → Define Parallel Processing in MRP
Action Code – Planned Order Control
Action Control – Planned Order
Text: User Exit Planning Run
Plng File Entries for Goods Mvmts
Maintain Consumption ModeMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Master Data → BOM by Date
Customizing Repetitive Manufacturing
List Profile Component List
PP/MRP Customizing Explosion
Customizing Planning Time Fence
Customizing for Order Report
Customizing Purchase Req. Conversion
Customizing Direct ProcurementMenu Path : Logistics → Production → Production Planning → MPS → Master Data → BOM by Date
C M MRP Plant Parameters for MRP
Strategy Group for MRP Group
Collective availibility checkProfile
Background Job: Adjmt. of Dep. Reqs
IMG Activity: SIMG_CFMENUOLMDOMIB
IMG Activity: SIMG_CFMENUOLMDOMIR
IMG Activity: SIMG_CFMENUOLMDOMDD
IMG Activity: SIMG_CFMENUOLMDOMDV
IMG Activity: SIMG_CFMENUOLMDOPPH
IMG Activity: SIMG_CFMENUOLMDOMD3
IMG Activity: SIMG_CFMENUOLMDOMD5
IMG Activity: SIMG_CFMENUOLMDOMDJ
IMG Activity: SIMG_CFMENUOLMDOMDT
IMG Activity: SIMG_CFMENUOLMDOMI5
IMG Activity: SIMG_CFMENUOLMDOMDC
IMG Activity: SIMG_CFMENUOLMDOMIT
IMG Activity: SIMG_CFMENUOLMDOMDR
IMG Activity: SIMG_CFMENUOLMDOMIM
IMG Activity: SIMG_CFMENUOLMDOMIN
IMG Activity: SIMG_CFMENUOLMDOMDA
IMG Activity: W_DF_LT_0620
IMG Activity: W_DF_LT_0621
IMG Activity: W_DF_LT_0622
IMG Activity: SIMG_CMMENUOLMDOMI6
IMG Activity: SIMG_CFMENUOLMDOMDM
IMG Activity: SIMG_CFMENUOLMDOMIQ
IMG Activity: SIMG_CFMENUOPP1OM0A
IMG Activity: W_DF_LT_0611
IMG Activity: SIMG_CFMENUOLMDOPPC
IMG Activity: SIMG_CFMENUOLMDOMIL
IMG Activity: SIMG_CFMENUOLMDOMIO
IMG Activity: SIMG_CFMENUOLMDOMD2
IMG Activity: SIMG_CFMENUOLMDOMDG
IMG Activity: SIMG_CFMENUOLMDOMDK
IMG Activity: W_DF_LT_0610
IMG Activity: SIMG_CFMENUOPP1OWD1
IMG Activity: SIMG_CFMENUOLMDOMD9
IMG Activity: SIMG_CFMENUOLMDSML
IMG Activity: SIMG_CFMENUOLMDOMIP
IMG Activity: SIMG_CFMENUOLMDOMDU
IMG Activity: W_ZF_VK_0710
IMG Activity: SIMG_CFMENUOPP1OM0E
IMG Activity: SIMG_CFMENUOLMDOMDQ
IMG Activity: SIMG_CFMENUOLMDOMI8
IMG Activity: SIMG_CFMENUOLMDOPPZ
IMG Activity: SIMG_CFMENUOLMDOMIG
IMG Activity: SIMG_CFMENUOLMDOMI2
IMG Activity: SIMG_CFMENUOLMDOMI3
IMG Activity: SIMG_CFMENUOLMDOMD0
IMG Activity: SIMG_CFMENUOLMDOMDZ
IMG Activity: SIMG_CFMENUOLMDOPPI
IMG Activity: SIMG_CFMENUOLMDOMDW
IMG Activity: SIMG_CFMENUOLMDOMDY
IMG Activity: SIMG_CFMENUOLMDOMI4
IMG Activity: SIMG_CFMENUOLMDOMIA
IMG Activity: SIMG_CFMENUOPP1OM0D
IMG Activity: SIMG_CFMENUOLMDOMI1
IMG Activity: SIMG_CFMENUOLMDOMDX
IMG Activity: SIMG_XXMENUOLMDU
IMG Activity: SIMG_CFMENUOPP1OM0A
IMG Activity: SIMG_CFMENUOPP1OWD1
IMG Activity: SIMG_CFMENUOPP1OM0DMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Environment → Current Settings → Define Period Profile for Safety Time/Ac
IMG Activity: SIMG_CFMENUOPP1OM0E
IMG Activity: SIMG_CFMENUOM00OM15
IMG Activity: SIMG_CFMENUOM00OM16
IMG Activity: SIMG_CFMENUOM00OM17
IMG Activity: SIMG_CFMENUOM00OJIN1
IMG Activity: SIMG_CFMENUOM00OM19
IMG Activity: SIMG_CFMENUOM00OM20
IMG Activity: SIMG_CFMENUOM00OJI1
IMG Activity: SIMG_CFMENUOM00OJI2
IMG Activity: SIMG_CFMENUOM00OJI3
IMG Activity: SIMG_CFMENUOM00OJIN5
IMG Activity: SIMG_CFMENUOM00OM14
IMG Activity: SIMG_CFMENUOM00OM18
IMG Activity: SIMG_CFMENUOM00OJIN4
IMG Activity: SIMG_CFMENUOM00OJIN3
IMG Activity: SIMG_CFMENUOM00OJIN2
IMG Activity: SIMG_CFMENUOM00OM13
IMG Activity: SIMG_CFMENUOM00OM12
IMG Activity: SIMG_CFMENUOM00OM11
IMG Activity: SIMG_CFMENUOPP1OMIO
IMG Activity: SIMG_CFMENUOPP2OPPN
IMG Activity: SIMG_CFMENUOPP1OMIW
IMG Activity: SIMG_CFMENUOPP3OSPO
IMG Activity: SIMG_CFMENUOPP2OPPM
IMG Activity: SIMG_CFMENUOPP1OPPA
IMG Activity: SIMG_CFMENUOPP3OPKF
IMG Activity: SIMG_CFMENUOPP2OPPK
IMG Activity: SIMG_CFMENUOPP1OMDR
IMG Activity: SIMG_CFMENUOPP3OPKD
IMG Activity: SIMG_CFMENUOPP2OPPD
IMG Activity: SIMG_CFMENUOPP2OMDM
IMG Activity: SIMG_CFMENUOPP1OMIL
IMG Activity: SIMG_CFMENUOPP3RZ12
IMG Activity: SIMG_CFMENUOPP1OPPB
IMG Activity: SIMG_CFMENUOPP2OMI6
IMG Activity: SIMG_CFMENUOPP3OSP1
IMG Activity: SIMG_CFMENUOPP1CMD
IMG Activity: SIMG_CFMENUOPP2OMD0
IMG Activity: SIMG_CFMENUOPP3OPP5
IMG Activity: SIMG_CFMENUOPP1OPPC
IMG Activity: SIMG_CFMENUOPP2OMDQ
IMG Activity: SIMG_CFMENUOPP3OSPP
IMG Activity: SIMG_CFMENUOPP1MP1
IMG Activity: SIMG_CFMENUOPP1OMDG
IMG Activity: SIMG_CFMENUSPCUOSQ1
IMG Activity: SIMG_CFMENUOPP1OMI4
IMG Activity: SIMG_CFMENUSPCUOSQ2
IMG Activity: SIMG_CFMENUOPP3OSPN
IMG Activity: SIMG_CFMENUOPP3OMDM
IMG Activity: SIMG_CFMENUOPP3OMI6
IMG Activity: SIMG_CFMENUOPP3OKRV
IMG Activity: SIMG_CFMENUOPP3OKRC
IMG Activity: SIMG_CFMENUOPP3OKS9
IMG Activity: SIMG_CFMENUOPP3OKSP
IMG Activity: SIMG_CFMENUOPP3OKZ3
IMG Activity: SIMG_CFMENUOPP3OSP5
IMG Activity: SIMG_CFMENUOPP3OSPM
IMG Activity: SIMG_CFMENUOPP3OSPK
IMG Activity: SIMG_CFMENUOPP3OSP4
IMG Activity: SIMG_CFMENUOPP3OSPT
IMG Activity: SIMG_CFMENUOPP1OMD2
IMG Activity: SIMG_CFMENUOPP1OMDC
IMG Activity: SIMG_CFMENUOPP1OMIT
IMG Activity: SIMG_CFMENUOPP1OMDT
IMG Activity: SIMG_CFMENUOPP1OMI5
IMG Activity: SIMG_CFMENUOPP1OMIM
IMG Activity: SIMG_CFMENUOPP1OPVP
IMG Activity: SIMG_CFMENUOPP1OPP5
IMG Activity: SIMG_CFMENUOPP1OMD3
IMG Activity: SIMG_CFMENUOPP1OMIU
IMG Activity: SIMG_CFMENUOPP1OMIV
IMG Activity: SIMG_CFMENUOPP1OPPE
IMG Activity: SIMG_CFMENUOPP1OMDV
IMG Activity: SIMG_CFMENUOPP3OS81
IMG Activity: SIMG_CFMENUOPP1OPPH
IMG Activity: SIMG_CFMENUOPP3OS80
IMG Activity: SIMG_CFMENUOPP1OMIN
IMG Activity: SIMG_CFMENUOPP3OSP2
IMG Activity: SIMG_CFMENUOPP1OMIB
IMG Activity: SIMG_CFMENUOPP3OSPR
IMG Activity: SIMG_CFMENUOPP1OMIR
IMG Activity: SIMG_CFMENUOPP3OPB4
IMG Activity: SIMG_CFMENUOPP1OM0C
IMG Activity: SIMG_CFMENUOPP3OPB5
IMG Activity: SIMG_CFMENUOPP1OMIX
IMG Activity: SIMG_CFMENUOPP1OMDA
IMG Activity: SIMG_CFMENUOPP3OSPA
IMG Activity: SIMG_CFMENUOPP1OMD5
IMG Activity: SIMG_CFMENUOPP3OPB3
IMG Activity: SIMG_OPP3KAPAPLANUNG
IMG Activity: SIMG_CFMENUOPP1OMDD
IMG Activity: SIMG_CFMENUOPP1OPPJ
IMG Activity: SIMG_CFMENUOPP1OMD0
IMG Activity: SIMG_CFMENUOPP1OMII
IMG Activity: SIMG_CFMENUOPP1OMDQ
IMG Activity: SIMG_CFMENUOPP1OMD9
IMG Activity: SIMG_CFMENUOPP1SP
IMG Activity: SIMG_CFMENUOPP1OMDU
IMG Activity: SIMG_CFMENUOPP1OM01
IMG Activity: SIMG_CFMENUOPP1OMIZ
IMG Activity: SIMG_CFMENUOPP1OMIP
IMG Activity: SIMG_CFMENUOPP1OPPQ
IMG Activity: SIMG_CFMENUOPP1OMIQ
IMG Activity: SIMG_CFMENUOPP1OPPR
IMG Activity: SIMG_CFMENUOPP1OMIG
IMG Activity: SIMG_CFMENUOPP1OM0F
IMG Activity: SIMG_CFMENUOPP1OMI2
IMG Activity: SIMG_CFMENUOPP1OMI3
IMG Activity: SIMG_CFMENUOPP1OMIY
IMG Activity: SIMG_CFMENUOPP1OMDX
IMG Activity: SIMG_CFMENUOPP1OPPD
IMG Activity: SIMG_CFMENUOPP1OMDK
IMG Activity: SIMG_CFMENUOPP1OMI1
IMG Activity: SIMG_CFMENUOPP1OPPI
IMG Activity: SIMG_CFMENUOPP1OMDW
IMG Activity: SIMG_CFMENUOPP1OMDY
IMG Activity: SIMG_CFMENUOPP1OMIAMenu Path : Logistics → Materials Management → Material Requirements Planning (MRP) → MRP → Environment → Current Settings → Define Range of Coverage Profile (Dynami
IMG Activity: SIMG_CFMENUOPP1OMDZ
IMG Activity: SIMG_CFMENUOPP1OMDM
IMG Activity: SIMG_CFMENUOPP1OPPS
IMG Activity: SIMG_CFMENUOPP1OPPT
IMG Activity: SIMG_CFMENUOPP1OPPU
IMG Activity: SIMG_CFMENUOPP1OMPG
IMG Activity: SIMG_CFMENUOPP1OMI6
IMG Activity: SIMG_CFMENUOPP1OM0K
Click here to know details about SAP standard tables used with Material Requirements Planning – PP .