CM54 SAP tcode for – Capacity leveling: PS list via vers.

Here we would like to draw your attention to CM54 transaction code in SAP. As we know it is being used in the SAP PP-CRP (Capacity Requirements Planning – PP) component which is coming under PP module (Production Planning).CM54 is a transaction code used for Capacity leveling: PS list via vers. in SAP.

SAP CM54 transaction code

It comes under the package CY01.

SAP CM54 menu path

See the possible menu paths to access the same report by avoiding entering the transaction code.
Path 1
Information Systems → General Report Selection → Production Planning → Capacity Requirements Planning → Capacity leveling: PS list via vers.


Path 2
Logistics → Project System → Project → Simulation → Capacity Load Utilization → Simulation


Path 3
Accounting → Project System → Project → Simulation → Capacity Load Utilization → Simulation


Transaction CM54 technical data table

TcodeCM54
PurposeCapacity leveling: PS list via vers.
ModulePP
ComponentPP-CRP
SAP PackageCY01
TypeP