SAP Maintenance Processing in PM (PM-WOC) Transaction codes Full list

Here is a list of important 283 transaction codes used with SAP PM-WOC component (SAP Maintenance Processing in PM) coming under SAP PM Module. You will get more technical details of each of these SAP PM-WOC tcodes by clicking on the respective tcode name link.

CU: Compare Plan vs. Actual Costs

CU: Create Construction Measure

Change Construction Measure

Display Construction Measure

CU: Delete Construction Measure

No. Range Maintnce: /CUM/CMNUM

Create Compatible Unit

Change Compatible Unit

Display Compatible Unit

Compatible Unit Design Builder

Change designs

Display designs

No. Range Maintnce: /CUM/DESNM

CU: Generate CU Class Structure

Display Compatible Units

Change Compatible Units

Maintain Settlement Rule

Conversion Rule for Work Center

Mass Creation Notifications

Open MM Docs for Maint. Relationship

PM Documents for Maintenance Rel.

Master Equipment for Force Element

Internal Call: Forward Change Auth.

Technical Object Relocation Monitor

IMG Activity: /MRSS/SCHED009

IMG Activity: /MRSS/SCHED041

IMG Activity: /MRSS/SGE_ASS_CHECK

IMG Activity: /MRSS/RSG_PM_INT

IMG Activity: /MRSS/SCHED004


/MRSS/31000124

IMG Activity

IMG Activity: /MRSS/SCHED011

IMG Activity: /MRSS/SCHED021

IMG activity: /MRSS/SCHED022

IMG activity: /MRSS/SCHED023

IMG Activity: /MRSS/SCHED0081

IMG Activity: /MRSS/SCHED0082

IMG activity: /MRSS/SCHED0083

IMG Activity: /MRSS/SCHED0084

IMG activity: /MRSS/SCHED00810

IMG activity: /MRSS/SCHED00811

IMG activity: /MRSS/SCHED00812

IMG activity: /MRSS/SCHED0001

IMG activity: /MRSS/SCHED00040

IMG activity: /MRSS/SCHED0024

IMG activity: /MRSS/RAC_ASSGN_ELEM

IMG activity: /MRSS/RAC_SEARCH_ALG

IMG activity: /MRSS/INTER_COMPANY

IMG activity: /MRSS/SGE_RESOURCE

IMG activity: /MRSS/SCHED0085

IMG activity: /MRSS/CAPA_ASS_LIST

IMG activity: /MRSS/SGU_WORKLIST

IMG activity: /MRSS/SQE_QUALRESULT

IMG activity: /MRSS/SCHED0026

IMG activity: /MRSS/SCHED0027

IMG activity: /MRSS/MESSAGES

IMG activity: /MRSS/SCHED00813

IMG activity: /MRSS/SCHED00814

IMG activity: /MRSS/SQE_MATCHING

IMG activity: /MRSS/SCHED012

IMG activity: /MRSS/RAP_BACK

IMG activity: /MRSS/ALERT_FUNCTION

IMG activity: /MRSS/SCHED0028

IMG activity: /MRSS/RAC_CHECK_DURA

IMG activity: /MRSS/SCHED0029

IMG activity: /MRSS/SGU_RES_FILTER

IMG activity: /MRSS/SCHED0031

IMG activity: /MRSS/RAP_PS_INT

IMG activity: /MRSS/SCHED024

IMG activity: /MRSS/SQP_DEM_EXIT

IMG activity: /MRSS/SQP_EMP_EXIT

IMG activity: /MRSS/SCHED00700

IMG Activity: /MRSS/SCHED0033

IMG Activity: /MRSS/SQL_CAT_MIGR

IMG Activity

IMG Activity

IMG Activity

IMG Activity

IMG Activity

IMG Activity

IMG Activity

IMG Activity

IMG Activity

IMG Activity

IMG Activity

Unplanned Demands

Global demand search

Free employee search

Customizing for MRSS

Customizing for MRSS

Lean Planning Board

Optimizer Analysis Tool

Optimizer Log

PB Optimizer

For Internal Use Only

Manager’s Planning Board

Planning board via RP structure

Planning Board for RP Node

Planning Board (General)

Planning Board for Demands

Resource Planning for Service Orders

Scheduler Workplace

Team Maintenance

Manager’s Approval Screen

Employee Profile Maintenance

Employee Profile Maintenance

Worklist: Contact Person

Worklist: Contact Person (General)

Field control by authorizations

Field control by progress

RCCF: Process Destinations

RCCF: Log Display

RCCF: Advanced Settings

RCCF: Display Active Sessions

RCCF: Version Display

Requirement Profile Maintenance

Customizing for Resource Management

Customizing for RM R/3

Customizing for Resource Management

Transacton code to maintain Routing

Maintain Assignment Types

Maintain Broadcast Targets

Tx for Maintenance view of C_RM_BTNV

Maintain Corporate Companies

Maintain Corporate Organization

Maintain CRM Order Probability

Maintain Contract Types

Maintain Escalation Types

Maintain Flow Down Terms

Maintain Job Texts

Maintain Line of Business

Maintain Order Probablity

Maintain Request Origins

Maintain Project Activity types

Maintain Partner Rejection Codes

Maintain Partner Statuses

Maintain Reasons for Close

Maintain Request Types

Maintain Role Types

Exclude From SLA Tracking Reasons

Transaction for Compliance Report

Qualification Catalogs

Filter Information

Number ranges for catalogs

Qualification matrixes

Number ranges for matrixes

System parameters for qualifications

Number ranges for qualifications

Profile Key Number Range

Set up workflow

All Workflows for Employee Profiles

To maintain broadcast other regions

To maintain broadcast other regions

To maintain Broadcast RM groups

To maintain Broadcast Vendors groups

Transaction for Technician Worklist

Utilization report

Maintain WFM Core Resources

MRS Administration HR

WFM Core Customizing

Transfer assignment status

Postal Code Areas of Resources

Rebuild PM/CS order operation costs

MAM Debugging Settings

Smartsync Settings

Inventory Management Profile

Notification Processing Profile

Order Processing Profile

Change Mobile Status for Order

MAM PUSH Control

Mobile Asset Management Scenario

User-specific settings

User Settings for EAM

Subscreens for Simple Notification

Create Equipment

Change Equipment

Display Equipment

Create Notification

Change Notification

Display Notification

OCI:Convert HTML Field Values

OCI: Convert HTML – SAP Field

OCI: Conversion Functions

OCI: Assign Catalogs to Order Type

Create cond. records qual.notificatn

Change cond.records qual.notificatn

Display cond.records qual.notificatn

Document flow list
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → History → Document Flow List

Material Where-used List
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → History → Material Where-Used List

Quality Notification No. Assignment

Create PM Notification – General
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Notification → Create (General)

Change PM Notification
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Notification → Change

Display PM Notification
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Notification → Display

Create PM Malfunction Report
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Notification → Create (Special) → Malfunction Report

Create PM Activity Report
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Notification → Create (Special) → Activity Report

Create Maintenance Request
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Notification → Create (Special) → Maintenance Request

Set deletion flag f. PM notification
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Notification → Set Deletion Flag

Change Notifications
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Notification → List Editing → Change

Display Notifications
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Notification → List Editing → Display

Create Order
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Create (General)

CHANGE ORDER
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Change

Display PM Order
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Display

PM Order for PM Notification
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Create (Special) → Order for Notification

Create PM Sub-Order
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Create (Special) → Sub-Order

Change Operations
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Operation List → Change

Change PM Orders
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Order List → Change

Display PM orders
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Order List → Display

IW39 – Call from Workplace/Mini-App

Print Order
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Print

Change order component list
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Component List → Change

Display Order Component List
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Component List → Display

List of Goods Movements for Order
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Completion Confirmation → Goods Movement → Display Goods Movement

Enter PM Order Confirmation
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Completion Confirmation → Entry → Individual Time Confirmation

Overall Completion Confirmation
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Completion Confirmation → Entry → Overall Completion Confirmation

Display PM Order Confirmation
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Completion Confirmation → Display → Completion Confirmation

PM Order Collective Confirmation
Menu Path : Logistics → Quality Management → Test Equipment Management → Calibration Inspection → Order Confirmation → Collective entry

Cancel PM Order Confirmation
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Completion Confirmation → Cancel

Postprocessing of PDC Error Records
Menu Path : Logistics → Sales and Distribution → Sales → Product Cost by Sales Order → Actual Postings → Time Sheet → Transfer → Plant Maintenance/Customer Service → Postprocessing Confirmations

Confirmation List
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Completion Confirmation → Display → Confirmation List

Confirmation using operation list
Menu Path : Logistics → Customer Service → Information System → Report Selection → Service Processing → Confirmation with Operations List

Display Operations
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Operation List → Display

Create Service Notification-General
Menu Path : Logistics → Customer Service → Service Processing → Notification → Create (General)

Change Service Notification

Display Service Notification
Menu Path : Logistics → Customer Service → Service Processing → Notification → Display

Create Service Notification-Malfn.
Menu Path : Logistics → Customer Service → Service Processing → Notification → Create (Special) → Problem Notification

Set Deletion Flag For Notification
Menu Path : Logistics → Customer Service → Service Processing → Notification → Set Deletion Flag

Change Service Notifications

Display Service Notifications
Menu Path : Logistics → Customer Service → Service Processing → Notification → List Editing → Display

Create Historical PM Order
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → History → Historical Orders → Create

Change Historical Order
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → History → Historical Orders → Change

Display Historical PM Order
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → History → Historical Orders → Display

Change Activities
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Notification → List of Activities → Change

Display activities
Menu Path : Logistics → Plant Maintenance → Information System → Report Selection → Maintenance Processing → Display Activities

Change Tasks
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Notification → List of Tasks → Change

Display Tasks
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Notification → List of Tasks → Display

Change Notification Items
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Notification → List of Items → Change

Display Notification Items
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Notification → List of Items → Display

Orders Overall Network Scheduling
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Scheduling of Overall Network

Goods Receipt f. Refurbishment Order
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Completion Confirmation → Goods Movement → Refurbishment Goods Receipt

Material availability information
Menu Path : Logistics → Plant Maintenance → Information System → Report Selection → Maintenance Processing → Material Availability

Create / Change Revision

Display Revision

Activate Business Process for MSAM

RFC destinations for delta replicat.

Template Equipment Profile

General settings for Data Movement

Multi-Language settings for MSAM

Notification Processing Profile

Order Processing Profile

Maintenance Order Cost Profile

List Editing of Permits

Maintenance of PM value categories

Maint. of PM value cat. assignments

Maintenance of Cost Estimate Version

Edit Response Profile

Service Window

Notification Info Window

PM Graphic and Rel. for Orders

Default Planning Indicator

Field Sel. Equipment Usage List

Equipment List – CS

Functional Location List – CS

Service Order List

Order List – CS

Check Report for Value Categories

PM Notification List

CS Notification List

PM order list

List of Tasks

Notification Item List

Start values – notification

Create PAM Requirement

Create Pools

Maintain Pools

Graphical Operational Planning (PAM)







IMG Activity

Click here to know details about SAP standard tables used with Maintenance Processing in PM.