SAP Overhead Cost Controlling in CO (CO-OM) Transaction codes Full list

Here is a list of important 1493 transaction codes used with SAP CO-OM component (SAP Overhead Cost Controlling in CO) coming under SAP CO Module. You will get more technical details of each of these SAP CO-OM tcodes by clicking on the respective tcode name link.

CO Variant Maintenance: Cost Centers

List Variants, CCA/ABC Master Data

CO Area Settings, Business Processes

Change Business Process Attributes

CO Variant Maintenance: CO-OM-ABC

Master Data Report: Cost Objects
Menu Path : Accounting → Controlling → Product Cost Controlling → Cost Object Controlling → Intangible Goods and Services → Cost Object → Cost Object → Directory

Import Business Process Reports

Delete Business Processes

CO-OM-ABC: Change Process Category

Display Process Category Customizing

Maintain Search Help for Bus. Proc.

Display Search Help for Bus. Proc.

CO-OM-ABC: Transport Customizing

INTERNAL: Work List

Check Archiving Documentation

Residence Times for CO Line Items

Send Cost Center
Menu Path : Logistics → Logistics Execution → Transportation → Transportation Planning → External Planning System → ALE Monitoring → Goto → Master Data Distribution → Accounting → Cost Center → Master Data → Send

Get Cost Center
Menu Path : Logistics → Logistics Execution → Transportation → Transportation Planning → External Planning System → ALE Monitoring → Goto → Master Data Distribution → Accounting → Cost Center → Master Data → Get

Send General Ledger Account
Menu Path : Logistics → Logistics Execution → Transportation → Transportation Planning → External Planning System → ALE Monitoring → Goto → Master Data Distribution → Accounting → G/L Account → Send

Send Cost Elements
Menu Path : Logistics → Logistics Execution → Transportation → Transportation Planning → External Planning System → ALE Monitoring → Goto → Master Data Distribution → Accounting → Cost Element → Send Master Data

Send Activity Type
Menu Path : Logistics → Logistics Execution → Transportation → Transportation Planning → External Planning System → ALE Monitoring → Goto → Master Data Distribution → Accounting → Activity Type → Master Data → Send

Get Activity Type
Menu Path : Logistics → Logistics Execution → Transportation → Transportation Planning → External Planning System → ALE Monitoring → Goto → Master Data Distribution → Accounting → Activity Type → Master Data → Get

Send cost center activity prices
Menu Path : Logistics → Logistics Execution → Transportation → Transportation Planning → External Planning System → ALE Monitoring → Goto → Master Data Distribution → Accounting → Cost Center → Plan Prices → Send

Send obj/cost element control data
Menu Path : Logistics → Logistics Execution → Transportation → Transportation Planning → External Planning System → ALE Monitoring → Goto → Master Data Distribution → Accounting → Cost Center → Unit of Measure and Cost Element → Send

Send Business Process Groups
Menu Path : Logistics → Logistics Execution → Transportation → Transportation Planning → External Planning System → ALE Monitoring → Goto → Master Data Distribution → Accounting → Business Process → Send Group

Send Business Processes
Menu Path : Logistics → Logistics Execution → Transportation → Transportation Planning → External Planning System → ALE Monitoring → Goto → Master Data Distribution → Accounting → Business Process → Send Process

Send Business Process Price
Menu Path : Logistics → Logistics Execution → Transportation → Transportation Planning → External Planning System → ALE Monitoring → Goto → Master Data Distribution → Accounting → Business Process → Send Price

BCT-CO: Change Report Row Hierarchy

BCT-CO: Displ/Check Report Row Hier.

Call Doc. Display for CCtr Monitor

Start F4

Start Report/Report Interface

Change Project Original Budget

Display Project Original Budget
Menu Path : Logistics → Project System → Financials → Budgeting → Original Budget → Display

Change Project Release

Display Project Release
Menu Path : Logistics → Project System → Financials → Budgeting → Release → Display

Project Budget Transfer
Menu Path : Logistics → Project System → Financials → Budgeting → Transfer

Budget Return from Project
Menu Path : Logistics → Project System → Financials → Budgeting → Return → From Project

Budget Supplement to Project
Menu Path : Logistics → Project System → Financials → Budgeting → Supplement → To Project

Budget Supplement in Project
Menu Path : Logistics → Project System → Financials → Budgeting → Supplement → In Project

Budget Return in Project
Menu Path : Logistics → Project System → Financials → Budgeting → Return → In Project

Change Budget Document

Display Budget Document
Menu Path : Information Systems → Project System → Financials → Display Document → Budget

Change Project Plan

Display Project Plan
Menu Path : Logistics → Project System → Financials → Planning → Costs in WBS → Overall values → Display

Change Project Revenues

Display Project Revenues
Menu Path : Logistics → Project System → Financials → Planning → Revenues in WBS → Display

Maintain Project Settlement LIs

Plan Data Transfer: Projects
Menu Path : Accounting → Controlling → Profitability Analysis → Planning → Integrated Planning → Transfer Order/Project Planning → Transfer Project Plan – Individual Proce

Plan Data Transfer: Projects
Menu Path : Accounting → Controlling → Profitability Analysis → Planning → Integrated Planning → Transfer Order/Project Planning → Transfer Project Plan – Collective Proce

Settle Projects and Networks
Menu Path : Logistics → Project System → Financials → Period-End Closing → Single Functions → Settlement → Individual Processing

Actual Settlement: Projects/Networks
Menu Path : Logistics → Project System → Financials → Period-End Closing → Single Functions → Settlement → Collective Processing

Copy WBS Plan to Plan (Collective)
Menu Path : Logistics → Project System → Financials → Planning → Copy Costs and Revenues → Copy WBS Plan to Plan (Collective)

Copy Project Cost Planning (old)

Copy WBS Plan to Plan (Indiv.)
Menu Path : Logistics → Project System → Financials → Planning → Copy Costs and Revenues → Copy WBS Plan to Plan (Indiv.)

Copy WBS Actual to Plan (Collective)
Menu Path : Logistics → Project System → Financials → Planning → Copy Costs and Revenues → Copy WBS Actual to Plan (Collective)

Copy Project Revenue Planning (old)

Copy WBS Actual to Plan (Indiv.)
Menu Path : Logistics → Project System → Financials → Planning → Copy Costs and Revenues → Copy WBS Actual to Plan (Indiv.)

Plan Settlement: Projects
Menu Path : Logistics → Project System → Financials → Planning → Allocations → Settlement → Individual Processing

Copy Project Costing (Collective)
Menu Path : Logistics → Project System → Financials → Planning → Copy Costs and Revenues → Copy Project Costing (Collective)

Copy Project Costing (Indiv.)
Menu Path : Logistics → Project System → Financials → Planning → Copy Costs and Revenues → Copy Project Costing (Indiv.)

Plan Settlement: Projects
Menu Path : Logistics → Project System → Financials → Planning → Allocations → Settlement → Collective Processing

Reconstruct Availability Control

Activate Project Availabilty Control
Menu Path : Logistics → Project System → Financials → Budgeting → Tools → Activate Availability Control

Deactivate Project Availabilty Cntrl
Menu Path : Logistics → Project System → Financials → Budgeting → Tools → Deactivate Availability Control

Carry Forward Project Commitments
Menu Path : Logistics → Project System → Financials → Year-End Closing → Carry Forward Commitment

Display PS Cash Documents
Menu Path : Information Systems → Project System → Financials → Display Document → Payments

Change Statistical Key Figures
Menu Path : Logistics → Project System → Financials → Planning → Statistical Key Figures → Change (Network)

Display Statistical Key Figures
Menu Path : Logistics → Project System → Financials → Planning → Statistical Key Figures → Display  (Network)

Reval. ACT: Projects Ind.Pro.
Menu Path : Logistics → Project System → Financials → Period-End Closing → Single Functions → Revaluation at Actual Prices → Individual Processing

Reval. ACT: Projects Col.Pro.
Menu Path : Logistics → Project System → Financials → Period-End Closing → Single Functions → Revaluation at Actual Prices → Collective Processing

Overhead COMM: Projects Ind.Pro.
Menu Path : Logistics → Project System → Financials → Period-End Closing → Single Functions → Applied Overhead → Commitments: Individual Processing

Overhead COMM: Projects Col.Pro.
Menu Path : Logistics → Project System → Financials → Period-End Closing → Single Functions → Applied Overhead → Commitments: Collective Processing

Create Project Plan Adjustment

Change Project Plan Adjustment

Display Project Plan Adjustment

Delete Project Plan Adjustment

Execute Project Plan Adjustment

PS: Change plan CElem/Activ. input

PS: Display plan CElem/Activ. input
Menu Path : Logistics → Project System → Financials → Planning → Costs in WBS → Cost and Activity Inputs → Display

PS: Change plan primary cost element

PS: Display plan primary cost elem.

PS: Change activity input planning

PS: Display activity input planning

PS: Change revenue type planning

PS: Display Revenue Element Planning

PS: Change stat. key figure planning
Menu Path : Logistics → Project System → Financials → Planning → Statistical Key Figures → Change (WBS Element)

PS: Display stat. key fig. planning
Menu Path : Logistics → Project System → Financials → Planning → Statistical Key Figures → Display (WBS element)

PS: Change stat. key figure planning

PS: Display stat. key fig. planning

Act. Int Calc.: Projects Coll. Proc.
Menu Path : Logistics → Project System → Financials → Period-End Closing → Single Functions → Interest Calculation → Collective Processing

Archive CO Line Items
Menu Path : Accounting → Controlling → Cost Element Accounting → Environment → Archiving → CO Line Items

Act. Overhead: Prod.Ordr Ind.Pro.
Menu Path : Logistics → Production → Repetitive Manufacturing → Environment → Period-end Closing for Prod.Cost Collect → Overhead Costs → Individual Processing

Act. Overhead: Prod.Ordr Col.Pro.
Menu Path : Logistics → Production → Shop Floor Control → Period-End Closing → Overhead Calculation → Collective Processing

Act. Settlment: Prod./Process Orders
Menu Path : Logistics → Production → Shop Floor Control → Period-End Closing → Settlement → Collective Processing

Presett. Co-Products, Postprocessing
Menu Path : Logistics → Production → Shop Floor Control → Period-End Closing → Preliminary Settlement for Co-Products, → Collective Processing

Presett. Co-Products, Postprocessing
Menu Path : Logistics → Production → Shop Floor Control → Period-End Closing → Preliminary Settlement for Co-Products, → Individual Processing

Set Status “Closed”
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Completion → Collective Processing → Complete

Display Customizing Settings

Controlling Integration: Reposting

CO Integration: Link to Customizing

CO Integration: Reposting Maint.

CO Integration: Reposting Maint.

CO Integr.: Reposting – Indiv. Procg
Menu Path : Accounting → Controlling → Product Cost Controlling → Cost Object Controlling → CRM Service Processes → Period-End Closing → Single Functions → Reposting → Individual Processing

Actual Reval.: Prod.Ordr Ind.Pro.
Menu Path : Logistics → Production → Repetitive Manufacturing → Environment → Period-end Closing for Prod.Cost Collect → Revaluate at Actual Prices → Individual Processing

Actual Reval.: Prod.Ordr Col.Pro.
Menu Path : Logistics → Production → Shop Floor Control → Period-End Closing → Revaluation at Actual Prices → Collective Processing

Create Business Process

Change Business Process

Display Business Process
Menu Path : Accounting → Controlling → Activity-Based Costing → Master Data → Business Process → Individual Processing → Display

Delete Business Process
Menu Path : Accounting → Controlling → Activity-Based Costing → Master Data → Business Process → Individual Processing → Delete

Process: Display Changes

CO-ABC Planning: Activity Inputs

CO-ABC Planning: Display Act. Inputs
Menu Path : Accounting → Controlling → Activity-Based Costing → Planning → Cost/Activity/Process Inputs → Display

Edit Business Processes

Business Processes: Master Data Rep.
Menu Path : Accounting → Controlling → Activity-Based Costing → Master Data → Business Process → Collective Processing → Display

Delete Business Processes
Menu Path : Accounting → Controlling → Activity-Based Costing → Master Data → Business Process → Collective Processing → Delete

Business Alloc Structure Display
Menu Path : Accounting → Controlling → Activity-Based Costing → Information System → Reports for Activity-Based Costing → Master Data Indexes → Display Structure for Business Processes

CO-ABC Planning: Quantities & Prices

CO-ABC Planning: Display Qty/Price
Menu Path : Accounting → Controlling → Activity-Based Costing → Planning → Process Quantities/Prices → Display

Business Process: Change Management

CO-ABC Planning: Stat. Key Figures

CO-ABC Planning: Display Stat. KF
Menu Path : Accounting → Controlling → Activity-Based Costing → Planning → Statistical Key Figures → Display

Create ABC Planning Layout (ActInpt)

Change ABC Planning Layout (AcInput)

Display ABC Planning Layout (AcInpt)

Planning Layout: Create Qtys/Prices

Planning Layout: Change Qtys/Prices

Planning Layout: Display Qtys/Prices

Create ABC Planning Layout (St.KF)

Change ABC Planning Layout (St.KF)

Display ABC Planning Layout (St.KF)

Copy Planning for Business Processes

Business Processes: Copy Plan

Copy Planning for Business Processes
Menu Path : Accounting → Controlling → Activity-Based Costing → Planning → Planning Aids → Copy Actual to Plan

Business Process: Copy Act. to Plan

Actl. Template Alloc: Prof. Analysis
Menu Path : Accounting → Controlling → Profitability Analysis → Actual Postings → Period-End Closing → Transfer Cost Center Costs/Process Costs → Template Allocation

Archiving Business Processes
Menu Path : Accounting → Controlling → Activity-Based Costing → Environment → Archiving

Act. Template Alloc.: Bus. Processes
Menu Path : Accounting → Controlling → Activity-Based Costing → Period-End Closing → Single Functions → Allocations → Template Allocation

Business Processes: Act. Line Items
Menu Path : Accounting → Controlling → Activity-Based Costing → Information System → Reports for Activity-Based Costing → Line Items → Business Processes: Actual Line Items

Planning Report for Bus. Processes

Run Selected Reports

Select Reports

Bus. Processes: Planning Overview
Menu Path : Accounting → Controlling → Activity-Based Costing → Information System → Reports for Activity-Based Costing → Planning Reports → Planning Overview for Business Processes

Business Processes: Plan Line Items
Menu Path : Accounting → Controlling → Activity-Based Costing → Information System → Reports for Activity-Based Costing → Line Items → Business Processes: Plan Line Items

Bus. Process.: Activity Price Report
Menu Path : Accounting → Controlling → Activity-Based Costing → Information System → Reports for Activity-Based Costing → Prices → Price Report for Business Processes

Create Actual Indirect Acty Alloc.

Create Actual Indirect Acty Alloc.

Change Actual Indirect Acty Alloc.

Change Actual Indirect Acty Alloc.

Display Actual Indirect Acty Alloc.

Display Actual Indirect Acty Alloc.

Delete Actual Indirect Acty Alloc.

Delete Actual Indirect Acty Alloc.

Execute Actual Indirect Acty Alloc.
Menu Path : Accounting → Controlling → Activity-Based Costing → Period-End Closing → Single Functions → Allocations → Indirect Activity Allocation

Overview actual ind. activity alloc.

Act. Indirect Acty Alloc.: Overview

Create Indirect Activity Alloc. Plan

Create Indirect Activity Alloc. Plan

Change Indirect Activity Alloc. Plan

Change Indirect Activity Alloc. Plan

Display Indirect Acty Alloc. Plan

Display Indirect Acty Alloc. Plan

Delete Indirect Activity Alloc. Plan

Delete Indirect Activity Alloc. Plan

Execute Plan Indirect Acty Alloc.
Menu Path : Accounting → Controlling → Activity-Based Costing → Planning → Allocations → Indirect Activity Allocation

Indirect Acty Alloc. Plan: Overview

Indirect Acty Alloc. Plan: Overview

Predistrib. of Fixed Costs:Processes
Menu Path : Accounting → Controlling → Activity-Based Costing → Period-End Closing → Single Functions → Predistribution of Fixed Costs

Create Business Process Group

Change Business Process Group

Display Business Process Group
Menu Path : Accounting → Controlling → Activity-Based Costing → Master Data → Business Process Group → Display

Change Standard Hierarchy (BusProc)

Change Standard Hierarchy

Display bus. process std. hierarchy

Display Std Hierarchy/Business Proc.
Menu Path : Accounting → Controlling → Activity-Based Costing → Master Data → Standard Hierarchy → Display

Enter Statistical Key Figures

Price calc. in actl: process

Create Task Cost Data

Change Task Cost Data

Display Task Cost Data
Menu Path : Accounting → Controlling → Activity-Based Costing → Environment → Task Catalog → Display

Target=Actual-IAA: process
Menu Path : Accounting → Controlling → Activity-Based Costing → Period-End Closing → Single Functions → Allocations → Target=Actual Activity Allocation

ABC: Plan Reconciliation
Menu Path : Accounting → Controlling → Activity-Based Costing → Planning → Planning Aids → Plan Reconciliation

Create Actual Assess. for Processes

Create Actual Assess. for Processes

Change Actual Assess. for Processes

Change Actual Assess. for Processes

Display Actual Assess.for Processes

Display Actual Assess.for Processes

Delete Actual Assess. for Processes

Delete Actual Assess. for Processes

Execute Actual Assess.for Processes
Menu Path : Accounting → Controlling → Activity-Based Costing → Period-End Closing → Single Functions → Allocations → Assessment

Actual Assess. Processes: Overview

Actual Assess. Processes: Overview

Create Plan Assess. for Processes

Create Plan Assess. for Processes

Change Plan Assess. for Processes

Change Plan Assess. for Processes

Display Plan Assess. for Processes

Display Plan Assess. for Processes

Delete Plan Assessment for Processes

Delete Plan Assessment for Processes

Execute Plan Assess. for Processes
Menu Path : Accounting → Controlling → Activity-Based Costing → Planning → Allocations → Assessment

Plan Assess. for Processes: Overview

Plan Assess. for Processes: Overview

Plan Templ. Alloc.: Results Analysis
Menu Path : Accounting → Controlling → Profitability Analysis → Planning → Integrated Planning → Transfer Cost Center Planning/Process Pl → Template Allocation

Iter. plan act. price calc. (CO-ABC)

Plan Template Allocation: Process
Menu Path : Accounting → Controlling → Activity-Based Costing → Planning → Allocations → Template Allocation

Variance Calculation: Processes

Actual Cost Splitting: Processes
Menu Path : Accounting → Controlling → Activity-Based Costing → Period-End Closing → Single Functions → Splitting

Split Plan Costs

Create Template

Change Template

Display Template

Delete Template

Formula Plan for Bus. Processes
Menu Path : Accounting → Controlling → Activity-Based Costing → Planning → Planning Aids → Formula Planning

Actual Template Allocation: Order
Menu Path : Logistics → Production → Shop Floor Control → Period-End Closing → Template Allocation → Individual Processing

Actual Template Allocation: Orders

Actual Template Alloc.: Prod. Orders
Menu Path : Logistics → Production → Shop Floor Control → Period-End Closing → Template Allocation → Collective Processing

Actual Template Alloc.: Run Sched.
Menu Path : Logistics → Production → Repetitive Manufacturing → Environment → Period-end Closing for Prod.Cost Collect → Template Allocation → Individual Processing

Actual Templ. Allocation: Cost Obj.
Menu Path : Accounting → Controlling → Product Cost Controlling → Cost Object Controlling → Product Cost by Period → Period-End Closing → Single Functions: Cost Object Hierarchy → Template Allocation → Individual Processing

Actual Templ. Allocation: Cost Obj.

Actl Template Alloc.: Cust. Orders
Menu Path : Logistics → Materials Management → Foreign Trade/Customs → General Foreign Trade Processing → Environment → Sales – Export → Sales → Product Cost by Sales Order → Period-End Closing → Single Functions → Template Allocation

Actual Template Allocation: Project
Menu Path : Logistics → Project System → Financials → Period-End Closing → Single Functions → Template Allocation → Individual Processing

Actual Template Allocation: Projects
Menu Path : Logistics → Project System → Financials → Period-End Closing → Single Functions → Template Allocation → Collective Processing

Plan Template Allocation: Order
Menu Path : Accounting → Controlling → Internal Orders → Planning → Allocations → Template Allocation → Individual Processing

Plan Template Allocation: Orders

Plan Template Allocation: Project
Menu Path : Logistics → Project System → Financials → Planning → Allocations → Template Allocation → Individual Processing

Plan Template Allocation: Projects
Menu Path : Logistics → Project System → Financials → Planning → Allocations → Template Allocation → Collective Processing

Create Actual Process Distribution

Create Actual Process Distribution

Change Actual Distribution Process

Change Actual Distribution Process

Display Actual Process Distribution

Display Actual Process Distribution

Delete Actual Process Distribution

Delete Actual Process Distribution

Execute Actual Process Distribution
Menu Path : Accounting → Controlling → Activity-Based Costing → Period-End Closing → Single Functions → Allocations → Distribution

Actual Process Distribution Overview

Actual Process Distribution Overview

Create Plan Process Distribution

Create Plan Process Distribution

Change Plan Process Distribution

Change Plan Process Distribution

Display Plan Process Distribution

Display Plan Process Distribution

Delete Plan Process Distribution

Delete Plan Process Distribution

Execute Plan Process Distribution
Menu Path : Accounting → Controlling → Activity-Based Costing → Planning → Allocations → Distribution

Plan Process Distribution Overview

Plan Process Distribution Overview

Actual overhead calc.: process
Menu Path : Accounting → Controlling → Activity-Based Costing → Period-End Closing → Single Functions → Allocations → Overhead

Plan Overhead: Business Processes
Menu Path : Accounting → Controlling → Activity-Based Costing → Planning → Allocations → Overhead

Function Tree with Tree Control

Report Writer: Extract Management
Menu Path : Logistics → Project System → Information System → Tools → Cost Element Reports → Extract Directory

Report Writer: Display Extracts

Report Writer: Delete Extracts

Report Writer: Print Extracts

Report Writer: Validity of Extracts

Extracts: User Settings

Extracts: User settings, coll.maint.

Create Cost Element

Change Cost Element

Display Cost Element
Menu Path : Accounting → Controlling → Cost Element Accounting → Master Data → Cost Element → Individual Processing → Display

Delete cost element
Menu Path : Accounting → Controlling → Cost Element Accounting → Master Data → Cost Element → Individual Processing → Delete

Cost element: display changes
Menu Path : Accounting → Controlling → Cost Element Accounting → Master Data → Cost Element → Individual Processing → Display Changes

Create Secondary Cost Element
Menu Path : Accounting → Controlling → Cost Element Accounting → Master Data → Cost Element → Individual Processing → Create Secondary

Cost Center Master Data
Menu Path : Accounting → Controlling → Cost Center Accounting → Environment → Archiving → Cost Centers: Overall

CO Totals Records
Menu Path : Accounting → Controlling → Cost Center Accounting → Environment → Archiving → Cost Centers: Planning Data

CO Line Items
Menu Path : Accounting → Controlling → Cost Center Accounting → Environment → Archiving → Cost Centers: Line Items

Archive admin: assess., distr., …
Menu Path : Accounting → Controlling → Cost Center Accounting → Environment → Archiving → Cost Centers: Allocations

Cost Elements: Master Data Report
Menu Path : Accounting → Controlling → Cost Element Accounting → Master Data → Cost Element → Collective Processing → Display

Delete Cost Elements
Menu Path : Accounting → Controlling → Cost Element Accounting → Master Data → Cost Element → Collective Processing → Delete

Planning Report: Orders

Order: Planning Overview
Menu Path : Accounting → Controlling → Internal Orders → Information System → Reports for Internal Orders → Planning Reports → Order: Planning Overview

Controlling Documents: Plan
Menu Path : Accounting → Controlling → Cost Center Accounting → Information System → Reports for Cost Center Accounting → Line items → CO Plan Documents

External Data Transfer

Delete All Costs Transferred w. KAFD

Create Cost Element Group

Change cost element group

Display cost element group
Menu Path : Accounting → Controlling → Cost Element Accounting → Master Data → Cost Element Group → Display

Delete ALE-COEP(L) Line Items
Menu Path : Accounting → Controlling → Cost Element Accounting → Environment → ALE → Delete ALE Line Items

Change statistical key figures
Menu Path : Logistics → Project System → Basic Data → Master Data → Statistical Key Figures → List Maintenance

Display Statistical Key Figures
Menu Path : Logistics → Project System → Basic Data → Master Data → Statistical Key Figures → List Display

Reconcil. Ledger Follow-Up Posting

Create Archive for Reconcil. Ledger

Delete Data After Archiving

Overview of Cost Flows

Overview of Cost Flows

Generate Reconcil. Ledger Reports

Activate Reconciliation Ledger

Deactivate Reconciliation Ledger

Cost Flow Message

Reconciliation Posting

Reset Reconciliation Ledger

Reconcil.Ledger: Display Totals Rec.

RCL: Parameter Transaction for GD13

Start Background Report RKAKALBT

Change Reconcil. Ledger Report List

Change Rules for Reconcil. Posting

Import Reconcil. Ledger Reports

Create Rules for Reconcil. Posting

Display Reconcil. Ledger Report Tree

Export Reconcil. Ledger (Rollup)

Reconciliaton Ledger: CO Line Items

Reverse Reconciliation Posting

Reconciliation Posting: Reverse

Fill Original Units in CO Document

Convert Reconc. Ledger Documents

Number range maint.: RK_BELEG

Display Conversion Milestones

Send Cost Center Totals Records
Menu Path : Logistics → Logistics Execution → Transportation → Transportation Planning → External Planning System → ALE Monitoring → Goto → Distribution in Applications → Accounting → Controlling → Cost Accounting → Totals Records for Cost Centers

Send Cost Center Group
Menu Path : Logistics → Logistics Execution → Transportation → Transportation Planning → External Planning System → ALE Monitoring → Goto → Master Data Distribution → Accounting → Cost Center → Cost Center Group → Send

Send Cost Element Group
Menu Path : Logistics → Logistics Execution → Transportation → Transportation Planning → External Planning System → ALE Monitoring → Goto → Master Data Distribution → Accounting → Cost Element → Send Group

Send Activity Type Group
Menu Path : Logistics → Logistics Execution → Transportation → Transportation Planning → External Planning System → ALE Monitoring → Goto → Master Data Distribution → Accounting → Activity Type → Activity Type Group → Send

Enter Manual Allocations

Display Manual Allocations

Reverse Manual Allocations

IAA via Internet

Maintain list of screen variants

Cost Transfer Layout Variants

Int. Cost Alloc. Screen Variants

Screen Variants: Stat. Key Figures

Transfer Revenue Screen Variants

Non-alloc. Activity Screen Variants

CO-ABC: Manual Actual Price
Menu Path : Logistics → Materials Management → Foreign Trade/Customs → General Foreign Trade Processing → Environment → Sales – Export → Sales → Product Cost by Sales Order → Actual Postings → Actual Price → Enter

CO-ABC: Display manual actl. price
Menu Path : Logistics → Materials Management → Foreign Trade/Customs → General Foreign Trade Processing → Environment → Sales – Export → Sales → Product Cost by Sales Order → Actual Postings → Actual Price → Display

Create statistical key figure group

Change statistical key figure group

Display statistical key figure group
Menu Path : Accounting → Controlling → Cost Center Accounting → Master Data → Statistical Key Figure Group → Display

CO-CCA: Manual Actual Price
Menu Path : Accounting → Controlling → Cost Center Accounting → Actual Postings → Actual Price → Enter

CO-CCA: Display manual actl price
Menu Path : Accounting → Controlling → Cost Center Accounting → Actual Postings → Actual Price → Display

Change Allocation Process Assessment

Change Indirect Activity Allocation

Change Indirect Activity Allocation

Change Allocation Transfer Posting

Change Allocation Resource Assessm.

Change Allocation Assessment

Change Allocation Distribution

CCA Allocation: Data Field Descript.

CCA: Field Use, Process Assessment

CCA: Field Use, JV Assessment

CCA: Field Use, JV Distribution

CCA: Field Use, Ind. Acty Alloc.

CCA: Field Use, Periodic Reposting

CCA: Field Use, Assessment

CO-OM-CCA: Distribution Field Use

CCA: Data Control, Proc. Assessment

CCA: Data Control, JV Assessment

CCA: Data Control, JV Distribution

CCA: Data Control, Ind. Acty Alloc.

CCA: Data Control, Period. Reposting

CCA: Data Control, Assessment

CCA: Data Control, Distribution

CCA Allocation: Field Group Texts

Test Calculation of CO Resource

Cost Resource: Test Environment

Change Allocation Assessment Result

Create Enterprise Organization

Change Enterprise Organization

Display Enterprise Organization
Menu Path : Accounting → Controlling → Cost Center Accounting → Master Data → Enterprise Organization → Display

Activate Cost Centers

Activate Profit Centers

Activate Processes

Change Altern. Profit Center Struct.

Display Alter. Profit Center Struct.

Settings for EntOrg Cost Centers

Settings for EntOrg Profit Center

Altern. Profit Center Struct. Active

Reset Inactive Cost Centers

Reset Inactive Profit Centers

Reset Inactive Business Process

Generate Standard Hierarchy

Generate Alternative Hierarchy

Replace Standard Hierarhcy

Where-Used List for Cycles (PA)

Maintain overhead dependencies

Act. Overhead: Int.Order Ind.Pro
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Completion → Individual Processing → Determine Actual Cost Surcharges

Actual Overhead:Int.Ord. Coll. Proc.
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Completion → Collective Processing → Determine Actual Cost Surcharges

Overhead Commt: Int.Orders Ind.Pro.
Menu Path : Accounting → Controlling → Internal Orders → Period-End Closing → Single Functions → Overhead Rates → Commitments: Individual Processing

Overhead Commt: Int.Orders Col.Pro.

Overhead Plan.: Int.Orders Ind.Pro.
Menu Path : Accounting → Controlling → Internal Orders → Planning → Allocations → Overhead rates → Individual Processing

Overhead Plan.: Int.Orders Col.Pro.

Overhead: Field catalog

Segment Adjustment: Overview

Segment Adjustment: Overview

Execute Actual Segment Adjustment

Display WBS Element Groups
Menu Path : Logistics → Project System → Project → Special Maintenance Functions → Work Breakdown Structure (WBS) → WBS Element Group → Display

Create Statistical Figure

Change Statistical Figure

Display Statistical Key Figures
Menu Path : Logistics → Project System → Basic Data → Master Data → Statistical Key Figures → Display

Delete Statistical Key Figures
Menu Path : Accounting → Controlling → Cost Center Accounting → Master Data → Statistical Key Figures → Individual Processing → Delete

Stat.Key Figures: Master Data Report
Menu Path : Accounting → Controlling → Cost Center Accounting → Information System → Reports for Cost Center Accounting → Master Data Indexes → Statistical Key Figures: Master Data Rep

Create Cond. Table (Price Overhead)

Change Cond.Table (Price Overhead)

Display Cond.Table (Price Overhead)

Actual settmt: prodn cost collector
Menu Path : Logistics → Production → Repetitive Manufacturing → Environment → Period-end Closing for Prod.Cost Collect → Settlement → Individual Processing

Actual Settlement: Cost Objects
Menu Path : Accounting → Controlling → Product Cost Controlling → Cost Object Controlling → Product Cost by Period → Period-End Closing → Single Functions: Cost Object Hierarchy → Settlement → Individual Processing

Sales Document Line Items Res.Anal.
Menu Path : Logistics → Sales and Distribution → Sales → Product Cost by Sales Order → Information System → Reports for Product Cost by Sales Order → Line Items → Sales Orders → Results Analysis

Planning report: Cost objects

Cost Object: Planning Overview

RS Header: Line Items Variance

Create Cost Object Group

Change Cost Object Group

Display Cost Object Group
Menu Path : Accounting → Controlling → Product Cost Controlling → Cost Object Controlling → Intangible Goods and Services → Cost Object → Cost Object Group → Display

Actual Reval.: Cost.Obj. Ind.Pro.
Menu Path : Accounting → Controlling → Product Cost Controlling → Cost Object Controlling → Product Cost by Period → Period-End Closing → Single Functions: Cost Object Hierarchy → Revaluation at Actual Prices → Individual Processing

Actual Reval.: Cost Obj. Col.Pro.

Create Activity Type

Change Activity Type

Display Activity Type
Menu Path : Accounting → Controlling → Cost Center Accounting → Master Data → Activity Type → Individual Processing → Display

Delete Activity Type
Menu Path : Accounting → Controlling → Cost Center Accounting → Master Data → Activity Type → Individual Processing → Delete

Activity type: Display changes
Menu Path : Accounting → Controlling → Cost Center Accounting → Master Data → Activity Type → Individual Processing → Display Changes

Activity Types: Master Data Report
Menu Path : Accounting → Controlling → Cost Center Accounting → Information System → Reports for Cost Center Accounting → Master Data Indexes → Activity Types: Master Data Report

Delete Activity Types
Menu Path : Accounting → Controlling → Cost Center Accounting → Master Data → Activity Type → Collective Processing → Delete

Templ. Alloc. Struct. CCTR/Acty Type
Menu Path : Accounting → Controlling → Cost Center Accounting → Information System → Reports for Cost Center Accounting → More Reports → Template Allocation Structure: Cost Cent

Change Allocation Assessment Ledger

Change Alloc. Distribution Ledger

Create Activity Type Group

Change Activity Type Group

Display Activity Type Group
Menu Path : Accounting → Controlling → Cost Center Accounting → Master Data → Activity Type Group → Display

Cost Center Selection Variants

Select. Variants for Bus. Processes

Selection Variants: Cost Elements

Activity Type Selection Variants

Target=Actual-IAA: cost centers
Menu Path : Accounting → Controlling → Cost Center Accounting → Period-End Closing → Single Functions → Allocations → Target=Actual Activity Allocation

Create Internal Order

Change Order
Menu Path : Accounting → Controlling → Product Cost Controlling → Cost Object Controlling → Collaboration Projects → Master Data → Special Functions → Change Order

Display Internal Order
Menu Path : Accounting → Controlling → Cost Element Accounting → Master Data → Accrual Order → Display

Order Manager
Menu Path : Accounting → Controlling → Product Cost Controlling → Cost Object Controlling → Collaboration Projects → Master Data → Edit Order

Data Transfer for Order Master Data
Menu Path : Accounting → Controlling → Internal Orders → Environment → Data Transfer → Master Data

Sender Structures for Trans. Data

Change Order Plan (Overall, Year)

Overall Planning for Orders: Change

Display Order Plan (Overall, Year)
Menu Path : Accounting → Controlling → Internal Orders → Planning → Overall Values → Display

Overall Planning for Orders: Display

Copy Planing for Internal Orders

Copy Order Plan Version (old)

Set planner profile

Copy Actual Int.Order Data to Plan
Menu Path : Accounting → Controlling → Internal Orders → Planning → Planning Aids → Copy Actual to Plan

Internal Orders: Easy Cost Planning

Change Order Budget
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Budget → Original Budget → Change

Display Order Budget
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Budget → Original Budget → Display

Change Order Supplement
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Budget → Supplement → Change

Display Order Supplement
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Budget → Supplement → Display

Change Order Return
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Budget → Return → Change

Display Order Return
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Budget → Return → Display

Activate Orders Availability Control
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Budget → Availability Control → Activate

Reconstruct Order Availability Cntrl

Deactivate Order Availability Cntrl
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Order → Budget → Availability Control → Deactivate

Actual Settlement: Order
Menu Path : Logistics → Production → Shop Floor Control → Period-End Closing → Settlement → Individual Processing

Display Settlement Document

Act. Settlment: Int.-/Maint. Orders
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Completion → Collective Processing → Settle

No. Ranges for Settlement Document

Plan Settlement: Internal Order
Menu Path : Accounting → Controlling → Internal Orders → Planning → Allocations → Settlement → Individual Processing

Plan Settlement: Internal Orders
Menu Path : Accounting → Controlling → Profitability Analysis → Planning → Integrated Planning → Transfer Order/Project Planning → Settle Order Plan – Collective Processin

Send Internal Order
Menu Path : Logistics → Logistics Execution → Transportation → Transportation Planning → External Planning System → ALE Monitoring → Goto → Master Data Distribution → Accounting → Internal Order → Send

Archive Settlement Documents
Menu Path : Logistics → Materials Management → Foreign Trade/Customs → General Foreign Trade Processing → Environment → Sales – Export → Sales → Product Cost by Sales Order → Environment → Archiving → Settlement Documents

Order Types: Budget Profile

Order Types: Default Int. Planning

Order Types: Classification

Order Types: Settlement Profile

Order Types: Model Order

Order Types: Commitment Update

Order Types: Plan Profile

Archive CO Orders
Menu Path : Accounting → Controlling → Internal Orders → Environment → Archiving → Orders

Orders: Actual Line Items
Menu Path : Logistics → Sales and Distribution → Sales → Product Cost by Sales Order → Information System → Reports for Product Cost by Sales Order → Line Items → Orders → Actual Costs

Line Item Monitor Orders (Actual)

Orders: Actual Line Items New

Orders: Commitment Line Items
Menu Path : Logistics → Sales and Distribution → Sales → Product Cost by Sales Order → Information System → Reports for Product Cost by Sales Order → Line Items → Orders → Commitments

Orders: Commitment Line Items

Orders: Budget Line Items
Menu Path : Accounting → Controlling → Internal Orders → Information System → Reports for Internal Orders → Line Items → Orders: Budget Line Items

Orders: WIP/Results Anal. Line Items
Menu Path : Logistics → Sales and Distribution → Sales → Product Cost by Sales Order → Information System → Reports for Product Cost by Sales Order → Line Items → Orders → WIP/Results Analysis

Orders: Plan Line Items
Menu Path : Accounting → Controlling → Internal Orders → Information System → Reports for Internal Orders → Line Items → Orders: Plan Line Items

Orders: Plan Line Items New

Run Selected Reports
Menu Path : Logistics → Plant Maintenance → Maintenance Processing → Order → Inspection Processing → Defect Data → Quality Notification → Costs → Information System → Report Selection

Carry Forward Order Commitments

Conversion Classification: AUFK

Create Order Group
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Completion → Collective Processing → Order Groups → Create

Change Order Group
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Completion → Collective Processing → Order Groups → Change

Display Order Group
Menu Path : Logistics → Production → Capacity Planning → Requirements → Maintenance Order → Completion → Collective Processing → Order Groups → Display

Collective Proc. Internal Orders
Menu Path : Accounting → Controlling → Internal Orders → Master Data → Special Functions → Collective Processing → Manually

Collective Disp. Internal Orders
Menu Path : Accounting → Controlling → Internal Orders → Master Data → Special Functions → Collective Processing → Collective Display → Master Data

Aut. Collect. Proc. Internal Orders
Menu Path : Accounting → Controlling → Internal Orders → Master Data → Special Functions → Collective Processing → Automatically

Master Data List Internal Orders
Menu Path : Accounting → Controlling → Cost Element Accounting → Information System → Reports for Cost and Revenue Element Acc → Master Data Indexes → Internal Orders: Master Data Report

Collect. Printing of Internal Orders
Menu Path : Accounting → Controlling → Internal Orders → Master Data → Special Functions → Collective Processing → Mass Printing

Order List (Master Data)

Create CO model order

Change CO Model Order

Display CO model order

Actual Reval.: Int.Orders Ind.Pro.
Menu Path : Accounting → Controlling → Internal Orders → Period-End Closing → Single Functions → Revaluation at Actual Prices → Individual Processing

Actual Reval.: Int.Orders Col.Pro.

Maintain Order Number Ranges

Create Orders for Plan Revaluation

Change Orders for Plan Revaluation

Display Orders for Plan Revaluation

Delete Orders for Plan Revaluation

Overall Plan., Orders: Create layout

Overall Plan., Orders: Change Layout

Overall Plan., Orders: Displ. Layout

Execute Orders for Plan Revaluation

Job Selection

Job Selection (Output)

Collective Displ.: Settlement Rules

Internal Orders: Coll. Displ. SettRu
Menu Path : Accounting → Controlling → Internal Orders → Master Data → Special Functions → Collective Processing → Collective Display → Settlement Rules

Prod. Orders: Coll. Displ. SettRules

Projects/Nets: Coll. Displ.SettRules
Menu Path : Logistics → Project System → Financials → Period-End Closing → Single Functions → Settlement Rule → List

Real Estate: Coll. Displ. Sett.Rules

Sales Doc.: Coll. Displ. Sett. Rules

Maintain Order Types – All Categs.

Functional Area Order Types (CO)

Order types for internal orders

Order Types for Internal Orders

Maintain Order Types – All Categs.

Display Order Types

Order types for internal orders

Costing Items for Order

Maintain Transaction Grps for Orders

Display Transaction Grps for Orders

Create Periodic Reposting

Create Periodic Reposting

Change Periodic Reposting

Change Periodic Reposting

Display Periodic Reposting

Display Periodic Reposting

Delete Periodic Reposting

Delete Periodic Reposting

Create Order Master Data (Web)

Edit Order Master Data (Web)

Set Planner Profile
Menu Path : Logistics → Project System → Financials → Planning → Costs in WBS → Set Planner Profile

Change CElem/Activity Input Planning

Display Planning CElem/Act. Input
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Cost and Activity Inputs → Display

Change Plan Data for Primary Costs

Display Plan Data for Primary Costs

Change Plan Data for Activity Types

Display Plan Data for Activity Types
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Activity Output/Prices → Display

CO Maintain Planner Profile

Maintain CO Planner Profiles

Maintain CO Planner Profiles

Maintain CO Planner Profiles

Display CO Planner Profile

Change Secondary Cost Plan Data

Display Secondary Costs Plan Data

Change Stat. Key Figure Plan Data

Display Stat. Key Figure Plan Data
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Statistical Key Figures → Display

Change Revenue Plan Data

Display Revenue Plan Data

Create Cost Planning Layout

Change Cost Planning Layout

Display Cost Planning Layout

Create Activity Type Planning Layout

Change Activity Type Planning Layout

Display Activ. Type Planning Layout

Maintain Distribution Keys

Create Distribution Key

Change Distribution Key

Display Distribution Key

Delete Distribution Key

Create Stat. KF Planning Layout

Change Stat. KF Planning Layout

Display Stat. KF Planning Layout

Delete Planned Costs

Delete Planned Costs

Delete Planned Costs
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Planning Aids → Delete → Planning Data

Delete Planning Data

Revaluate Manual Planning
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Planning Aids → Revaluate Manual Planning

Activate L. Items and Int. Planning
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Planning Aids → Activate Integration

Copy Planning for Cost Centers
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Planning Aids → Copy → Copy Plan to Plan

Copy Actual to Plan for Cost Centers
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Planning Aids → Copy → Copy Actual to Plan

Copy CO Resource Prices
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Planning Aids → Copy → Resource Prices

Revaluate CO Resource Prices
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Planning Aids → Revaluate → Resource Prices

Change Primary Cost Element Planning

Display Primary Cost Elem. Planning

Actl. Templ.-Alloc.: CCTR/Acty Type
Menu Path : Accounting → Controlling → Cost Center Accounting → Period-End Closing → Single Functions → Allocations → Template Allocation

Change Activity Type Plan Data

Display Activity Type Plan Data

Change Activity Input Planning

Display activity input planning

Change Stat. Key Figure Plan Data

Display Stat. Key Figure Plan Data
Menu Path : Accounting → Controlling → Internal Orders → Planning → Statistical Key Figures → Display

Change Revenue Element Planning

Display Revenue Element Planning

Log: Flexible Excel Upload

Flexible Upload for Excel Planning

Change CElem/Activity Input Planning

Display CElem./Acty Input Planning
Menu Path : Accounting → Controlling → Internal Orders → Planning → Cost and Activity Inputs → Display

Create Planning Parameters

Change Planning Parameters

Display Planning Parameters

Delete Planning Parameters

Create Cost Planning Layout

Change Cost Planning Layout

Display Cost Planning Layout

Maintain Distribution Keys

Create Distribution Key

Change Distribution Key

Display Distribution Key

Delete Distribution Key

Create Stat. KF Planning Layout

Change Stat. KF Planning Layout

Display Stat. KF Planning Layout

Transfer HR Costs to CO
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Planning Aids → Transfers → Personnel Costs HR

Change Stat. Key Figure Plan Data

Display Stat. Key Figure Plan Data

Allocation Templ. Plan: CCtr/ATyp
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Allocations → Template Allocation

Callup View Maintenance With COArea

Maintain Resources Master Record

Display Resource Master Record
Menu Path : Accounting → Controlling → Cost Center Accounting → Master Data → Resources → Display

Maintain CO Resource Price Types

Display CO Resource Price Types

Maintain CO Resource Prices

Maintain CO Resource Prices

CO Res.: Maintain Valuation Variants

CO Res.: Display Valuation Variants

CO Resources: Maint. Price Strategy

CO Resources: Display Price Strategy

Maintain Costing Sheet for CO Res.

Display Costing Sheet for CO Res.

Define Price Tables

Define Access Sequences

Copy Resource Planning

Evaluate resources used

Depend.Planning: Recalculation

CO-CCA Plan Reconciliation
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Planning Aids → Plan Reconciliation

Execute Plan Segment Reversal

Execute Formula Planning
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Planning Aids → Formula Planning → Costs and Statistical Key Figures

Create Plan Revaluation

Change Plan Revaluation

Display Plan Revaluation

Delete Plan Revaluation

Revaluate Plan in Background

Create Planning Parameters

Change Planning Parameters

Display Planning Parameters

Delete Planning Parameters

Change Cost Center Budget

Display Cost Center Budget
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Cost Center Budgets → Display

Create Summarization

Change Summarization

Display Summarization

Delete Summarization

Execute Summarization
Menu Path : Accounting → Controlling → Cost Center Accounting → Information System → Tools → Summarization

Run Sched. Header: Line Items Actual
Menu Path : Logistics → Production → Repetitive Manufacturing → Evaluations → CO Report Selection → Line Items → Product Cost Collectors → Actual Costs

Create cost center

Change cost center

Display Cost Center
Menu Path : Accounting → Controlling → Cost Center Accounting → Master Data → Cost Center → Individual Processing → Display

Delete cost center
Menu Path : Accounting → Controlling → Cost Center Accounting → Master Data → Cost Center → Individual Processing → Delete

Cost Center: Display Changes
Menu Path : Accounting → Controlling → Cost Center Accounting → Master Data → Cost Center → Individual Processing → Display Changes

Execute rough entry of cost center
Menu Path : Accounting → Controlling → Cost Center Accounting → Master Data → Cost Center → Collective Processing → Rough Entry

Execute list editing of cost center

Change Cost Centers

Cost Centers: Master Data Report
Menu Path : Accounting → Controlling → Cost Element Accounting → Information System → Reports for Cost and Revenue Element Acc → Master Data Indexes → Cost Centers: Master Data Report

Delete Cost Centers
Menu Path : Accounting → Controlling → Cost Center Accounting → Master Data → Cost Center → Collective Processing → Delete

Cost Centers: Change Management

Actual Accrual for Cost Centers
Menu Path : Accounting → Controlling → Cost Element Accounting → Actual Postings → Accrual Calculation

Execute actual accrual

Plan Accrual for Cost Centers
Menu Path : Accounting → Controlling → Cost Element Accounting → Planning → Accrual Calculation

Execute Plan Accrual

Maintain condition tables

Display condition tables

Accrual Calc.: Maintain Actual Data

Accrual Calc.: Maintain Tgt=Act Cred

Accrual Calc.: Maintain Plan Data

Maintain surcharge conditions

Display Overhead Conditions

Accrual: Maintain Overhead Structure

Cost Centers: Actual Line Items
Menu Path : Accounting → Controlling → Cost Center Accounting → Information System → Reports for Cost Center Accounting → Line items → Cost Centers: Actual Line Items

Line Item Monitor Cost Ctrs (Actual)

Cost Centers: Actual Line Items New

Cost Centers: Commitment Line Items
Menu Path : Accounting → Controlling → Cost Center Accounting → Information System → Reports for Cost Center Accounting → Line items → Cost Centers: Commitment Line Items

Controlling Documents: Actual
Menu Path : Accounting → Controlling → Cost Element Accounting → Information System → Reports for Cost and Revenue Element Acc → Document Display → Controlling Documents: Actual Costs

Controlling Documents: Actual

Planning Report: Cost Centers

Cost centers: Planning overview
Menu Path : Logistics → Sales and Distribution → Sales Information System → Planning → Flexible planning → Environment → Activity Requirement → Cost Center Planning Report

Cost Centers: Plan Line Items
Menu Path : Accounting → Controlling → Cost Center Accounting → Information System → Reports for Cost Center Accounting → Line items → Cost Centers: Plan Line Items

Cost Centers: Plan Line Items New

Cost centers: Activity prices
Menu Path : Accounting → Controlling → Cost Center Accounting → Information System → Reports for Cost Center Accounting → Prices → Cost Centers: Activity Prices

Cost Centers: Line Items (Actl/Plan)

Create Actual Indirect Acty Alloc.

Create Actual Indirect Acty Alloc.

Change Actual Indirect Acty Alloc.

Change Actual Indirect Acty Alloc.

Display Actual Indirect Acty Alloc.

Display Actual Indirect Acty Alloc.

Delete Actual Indirect Acty Alloc.

Delete Actual Indirect Acty Alloc.

Execute Actual Indirect Acty Alloc.
Menu Path : Accounting → Controlling → Cost Center Accounting → Period-End Closing → Single Functions → Allocations → Indirect Activity Allocation

Act. Indirect Acty Alloc.: Overview

Act. Indirect Acty Alloc.: Overview

Create Indirect Activity Alloc. Plan

Create Indirect Activity Alloc. Plan

Change Indirect Activity Alloc. Plan

Change Indirect Activity Alloc. Plan

Display Indirect Acty Alloc. Plan

Display Indirect Acty Alloc. Plan

Delete Indirect Activity Alloc. Plan

Delete Indirect Activity Alloc. Plan

Execute Plan Indirect Acty Alloc.
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Allocations → Indirect Activity Allocation

Indirect Acty Alloc. Plan: Overview

Indirect Acty Alloc. Plan: Overview

Carry Forward Cost Center Commitment

Find CCtrs in Cycles and Segments

Find Processes in Cycles / Segments

Display Cycle/Segment Objects

CO: Alloc. Structure for Assessment

Allocations: Extracts

Predistribute fixed costs: cctr
Menu Path : Accounting → Controlling → Cost Center Accounting → Period-End Closing → Single Functions → Predistribution of Fixed Costs

Create Cost Center Group

Change Cost Center Group

Display Cost Center Group
Menu Path : Accounting → Controlling → Cost Center Accounting → Master Data → Cost Center Group → Display

Actual Overhead: Cost Centers
Menu Path : Accounting → Controlling → Cost Center Accounting → Period-End Closing → Single Functions → Allocations → Actual Overhead

Commitment Overhead: Cost Centers
Menu Path : Accounting → Controlling → Cost Center Accounting → Period-End Closing → Single Functions → Allocations → Overhead Commitment

CO-OM-ABC: Transfer SOP/LTP
Menu Path : Logistics → Sales and Distribution → Sales Information System → Planning → Flexible planning → Environment → Activity Requirement → Transfer to Activity-Based Costing

Cycle Maintenance/Overview (CCA,ABC)

Plan Overhead: Cost Centers
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Allocations → Overhead

Iterative Plan Price Calculation

Transfer Planning From Logistics
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Planning Aids → Transfers → Scheduled Activity SOP/LTP

Execute Plan Revaluation

Strategies for Internal Orders

Maintenance Order Strategies

WBS Element Strategies

Strategies for sales order item

Strategy Sequences for WBS Elements

Strategy Sequences: Internal Orders

Strategy Sequences for PM-Orders

Strategy Sequences for WBS Elements

Strat. sequences f. sales order item

Strategy Seq. – Order Cat.: Internal

Strategy Sequence – Ordtyp PM-Orders

User-Defined Strategies

Allocations: Runtime Analysis

Variance Calculation: Cost Centers

Actual Cost Splitting: Cost Centers
Menu Path : Accounting → Controlling → Cost Center Accounting → Period-End Closing → Single Functions → Splitting

Calculate Target Costs

Split Plan Costs
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Allocations → Splitting

Create Actual Assessment

Create Actual Assessment

Change Actual Assessment

Change Actual Assessment

Display Actual Assessment

Display Actual Assessment

Delete Actual Assessment

Delete Actual Assessment

Execute Actual Assessment
Menu Path : Accounting → Controlling → Cost Center Accounting → Period-End Closing → Single Functions → Allocations → Assessment

Actual Assessment: Overview

Actual Assessment: Overview

Create Plan Assessment

Create Plan Assessment

Change Plan Assessment

Change Plan Assessment

Display Plan Assessment

Display Plan Assessment

Delete Plan Assessment

Delete Plan Assessment

Execute Plan Assessment
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Allocations → Assessment

Plan Assessment: Overview

Plan Assessment: Overview

Create Actual Distribution

Create Actual Distribution

Change Actual Distribution

Change Actual Distribution

Display Actual Distribution

Display Actual Distribution

Delete Actual Distribution

Delete Actual Distribution

Execute Actual Distribution
Menu Path : Accounting → Controlling → Cost Center Accounting → Period-End Closing → Single Functions → Allocations → Distribution

Actual Distribution: Overview

Actual Distribution: Overview

Create Plan Distribution

Create Plan Distribution

Change Plan Distribution

Change Plan Distribution

Display Plan Distribution

Display Plan Distribution

Delete Plan Distribution

Delete Plan Distribution

Execute Plan Distribution
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Allocations → Distribution

Plan Distribution: Overview

Plan Distribution: Overview

Create Periodic Reposting

Create Periodic Reposting

Change Periodic Reposting

Change Periodic Reposting

Display Periodic Reposting

Display Periodic Reposting

Delete Periodic Reposting

Delete Periodic Reposting

Execute Actual Periodic Reposting
Menu Path : Accounting → Controlling → Cost Center Accounting → Period-End Closing → Single Functions → Periodic Reposting

Periodic Repostings: Overview

Periodic Repostings: Overview

Create Plan Periodic Reposting

Create Plan Periodic Reposting

Change Plan Periodic Reposting

Change Plan Periodic Reposting

Display Plan Periodic Reposting

Display Plan Periodic Reposting

Delete Plan Periodic Reposting

Delete Plan Periodic Reposting

Execute Plan Periodic Reposting
Menu Path : Logistics → Project System → Financials → Planning → Costs in WBS → Periodic Transfers

Plan Periodic Repostings: Overview

Plan Periodic Repostings: Overview

Where-Used List: Cycles in CCA

View Maint.: Find Template

Maintain Assignment Cost Ctr./KF

Display Plan Assignment CCtr/KF

Maintain Actual Assignment CCtr/KF

Display Actual Assignment CCtr/KF

Transfer Plan Statistical Key Figure
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Planning Aids → Transfers → Activity-Independent Statistical Key Fig

Copy Assignment CCtr/KF

Maintain Plan Assignment Process/KF

Display Plan Assignment Process/KF

Change Actual Assignment Process/KF

Display Actual Assignment Process/KF

PROZ: Copy Plan Stat. Key Figures
Menu Path : Accounting → Controlling → Activity-Based Costing → Planning → Planning Aids → Transfers → Statistical Key Figures, LIS

PROZ: Copy Actual Stat. Key Figures
Menu Path : Accounting → Controlling → Activity-Based Costing → Period-End Closing → Single Functions → Transfer Statistical Key Figures from LI

Copy Assignment Processes/KF

Sales Documents: Commit. Line Items
Menu Path : Logistics → Sales and Distribution → Sales → Product Cost by Sales Order → Information System → Reports for Product Cost by Sales Order → Line Items → Sales Orders → Commitments

Change Plan Assignment CObj/KF

Display Plan Assignment CObj/KF

Change Actual Assignment CObj/KF

Display Actual Assignment CObj/KF

KSRTG: Copy Plan Stat. Key Figures
Menu Path : Accounting → Controlling → Product Cost Controlling → Cost Object Controlling → Intangible Goods and Services → Planning → Periodic Planning for Cost Objects → Transfer Key Figures from LIS

KSRTG: Copy Actual Stat. Key Figures
Menu Path : Accounting → Controlling → Product Cost Controlling → Cost Object Controlling → Intangible Goods and Services → Period-End Closing → Single Functions: Cost Object → Transfer Statistical Key Figures from LI

Copy Assignment Cost Object/Key Fig.

Maintain Plan Assignment ATyp/KF

Display Plan Assignment ATyp/KF

Change Actual Assignment ATyp/KF

Display Actual Assignment ATyp/KF

LSTAR: Copy Plan Stat. Key Figures
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Planning Aids → Transfers → Activity-Dependent Statistical Key Figur

LSTAR: Copy Actual Stat. Key Figures
Menu Path : Accounting → Controlling → Cost Center Accounting → Period-End Closing → Single Functions → Transfers → Activity-Dependent Statistical Key Figur

Copy Assignment ActType/Key Figure

WWW: Internal Price List

Create Group (Hierarchical)

Change Group (Hierarchical)

Display Hierarchy (Hierarchical)

Select Overhead

Maintain Calculation Base

Calculation Base Cost Ctr/Activ.Type

Maintain Credit

Maintain quantity-based overhead

Maintain Basis of Output Quantity

Maintain Costing Sheet

Maintain Percentage Overhead

Actual Reval.: PrCstCol. Ind.Pro.
Menu Path : Logistics → Production → Shop Floor Control → Period-End Closing → Revaluation at Actual Prices → Individual Processing

Actual Reval.: PrCstCol. Col.Pro.

Test Message

Import models cost elements

Controlling Area: Components/StKFs

Maintain Status Profiles

Display Status Profiles

Reset “Budgeted” Status

Maintain Reconcil. Ledger Nr. Ranges

Maintain Budget Manager

Maintain authorization group version

Planner Profiles: Maint. Auth.Group

Reconciliation Ledger: Acct Determ.

RW/RP Reports Reconc. Ledger Archive

Display Cost Center Types

Maintain Cost Center Categories

Maintain Attribute Groups

Display Attribute Groups

Maintain Cost Element Attributes

Display Cost Element Attributes

Change Primary Posting Price Var.

Display Primary Posting Price Var.

Transfer G/L Acct: Display Defaults

Transfer G/L Acct: Maintain Defaults

Batch Input for Cost Elements

Generate Cost Center Acctg. Reports

Change Automatic Account Assignment

CO Account Determination

CO-Account Determination: Rule Maint

Transfer FI Documents to CO

Transfer MM Documents to CO

Transfer SD Documents to CO

Change Function Areas

Import Planning Layouts

Post Down Payments

Display CO Transactions

Delete transaction data

Delete Cost Centers

Delete cost elements

Delete Activity Types

Define Validation

Change Currency Translations

Define Substitution

Change “All Currencies” Indicator

Export CO-CCA Reports

Import CO-CCA Reports

Import Individual Reports

Display logical databank CRK

Transport Organization Customizing

Display logical databank CEK

Display logical databank CIK

Display logical databank CPK

Transport Organization Customizing

Transport Mater Data Settings

Transport Planning Settings

Transport Actual Posting Settings

Transport Tool Settings

Maintain Cost Center Matchcode IDs

Display Cost Center Matchcode IDs

Maintain Cost Element Matchcode IDs

Display Cost Element Matchcode IDs

Maintain Activity Type Matchcode IDs

Display Activity Type Matchcode IDs

Change Time-Based Fields/Cost Ctrs

Display Time-Based Fields/Cost Ctrs

Maintain Time-Based Fields/Act.Types

Display Time-Based Fields/Act.Types

Maintain Time-Based Fields/CElems

Display Time-Based Fields/CElems

Display logical databank SAK

Display Standard Hierarchy

Display Standard Hierarchy
Menu Path : Accounting → Controlling → Cost Center Accounting → Master Data → Standard Hierarchy → Display

Display stand.hierarchy: UO active

Change Standard Hierarchy

Change Standard Hierarchy

Change standard hierarchy: UO active

Down Payment: Maintain Default CElem

Maintain Versions (General)

General Version Maintenance

Define Component/Switching Structure

Maintain Splitting Structure

Maintain Price Calculation Settings

Maintain settings: plan reconciliatn

Maintain settings: target=actl IAA

Change Source Structure

Maintain Versions (CO Area)

Change Valuation in Version 0

Version Maintenance in CO Area

Transport Planning Layouts

Display Time-Dependent Field/Process

Change Time-Dependent Field/Process

Change Budget Planning Profile

Maintain Controlling Area

Maintain Controlling Area

Controlling Area: ALE Settings

Controlling Area: ALE Settings

Set Controlling Area
Menu Path : Accounting → Financial Accounting → General Ledger → Master Records → Profit Center → Set Controlling Area

Maintain ABC Report Tree

Maintain CCA Report Tree

Display IMG Structure

IMG Controlling: General

IMG Controlling: General

Import models Cost Center Accounting

Maintain Order Matchcode IDs

Display Order Matchcode IDs

Maintain Hier.Std.Cost Elem.Layout

Delete CO Orders

Maintain Allocation Structure

Maintain Settlement Profiles

Maintain Processing Groups

Maintain Settlemen Exchng. Rate Type

Init. Screen-Customizing Settlement

CO Orders: Budgeting profiles

Convert Avlability Cntrl Tol.Limits

Maintain overhead key

Maintain Cost Element Group

Maintain Capitalization Percentages

Results Analysis Key for Cap.Value

Int.Orders: Maintain Screen Variants

Selection Rules for Internal Orders

Struct.Planning Profiles – CO Orders

Transport Settlement Tables

Substitution Rules – Internal Orders

Select. Variants for Internal Orders

Maintain Overhead Tables

Maintain Period Lock
Menu Path : Logistics → Materials Management → Foreign Trade/Customs → General Foreign Trade Processing → Environment → Sales – Export → Sales → Product Cost by Sales Order → Environment → Period Lock → Change

Display Period Lock
Menu Path : Logistics → Materials Management → Foreign Trade/Customs → General Foreign Trade Processing → Environment → Sales – Export → Sales → Product Cost by Sales Order → Environment → Period Lock → Display

Transfer Plan Data from Foreign Sys.

CCA Planning in Manager’s Desktop

Maintain View V_CBAR_PP

ABC Report List

Change Report Layout Bus. Processes

Generate ABC Reports

Transport Planning Layouts

Create Ntwk Pl.Layout Statistical KF

Change Ntwk Pl.Layout Statistical KF

Display Nwk Pl.Layout Statistical KF

Import models activities

Create Cost Element Planning Layout

Change Cost Element Planning Layout

Display Cost Element Planning Layout

Create Stat. KF Planning Layout

Change Stat. KF Planning Layout

Display Stat. KF Planning Layout

PS: Reset “Budgeted” Status
Menu Path : Logistics → Project System → Financials → Budgeting → Tools → Reset Status BUDG

Exclude Cost Elems from Avlbty Cntrl

Fincl Budgeting Profile for Projects

Convert Avlability Cntrl Tol.Limits

Configuration menu gen. controlling

Import models orders

Controlling Area: Basic Data

Controlling Area: Assgn. to CCode

Period Monitor: Log Display

PEP CO-PC-ACT: Dummy

Period Monitor: Log Display

Period monitor – log display

Per.Repostgs in Actual for Projects
Menu Path : Logistics → Project System → Financials → Period-End Closing → Single Functions → Periodic Transfers

Execute Per.Reposting Plan Projects

Simulation of CO line item summariz.

CO-OM-IS User Settings: Customizing

Display CO Document

CO Table Display

Display CO Cost Segments

Display Follow-On Documents

Info.Sys. Rec.Ledger: Presettings
Menu Path : Accounting → Controlling → Cost Element Accounting → Information System → User Settings

Info. Sys. Rec.Ldgr: Report Currency

Info. Sys. Rec.Ldgr: Report Currency

Info.Sys. Rec.Ledger: Presettings

Info.Sys. Proc.: Presettings
Menu Path : Accounting → Controlling → Activity-Based Costing → Information System → Tools → User Settings

Info.Sys. Proc.: Presettings

Info. System CCtrs: Presettings
Menu Path : Accounting → Controlling → Cost Center Accounting → Information System → User Settings

Info. System CCtrs: Presettings

Info. System CCtrs: Presettings

Info. System CCtrs: Presettings

Info. System Orders: Presettings
Menu Path : Accounting → Controlling → Internal Orders → Information System → User Settings

Info. System Orders: Presettings

Proj. Info System: Default Settings
Menu Path : Logistics → Project System → Information System → Tools → Cost Element Reports → Selection Criteria

Proj. Info System: Default Settings

CO-OM Information System: Settings
Menu Path : Accounting → Investment Management → Investment Projects → Information System → Tools → Cost Element Reports → Report Currency

CO-OM Information System: Settings

Repost Realtime Overhead

Realtime Overhead Upgrade Postings

Realtime customizing

Acti Realtime Overh for Business Tra

Activate Work Date = Document Date

Special Valuation Date Settings

IMG Activity: SIMG_0KWM_KSES_IST

IMG Activity: SIMG_CFMENU0KWMXKA06

IMG Activity: SIMG_CFMENU0KWMKCAB

IMG Activity: SIMG_0KWMCPV1

IMG Activity: SIMG_0KWMKCAV2

IMG Activity: SIMG_CFMENU0KWMCPP1

IMG Activity: SIMG_CFMENUORKSOKER1

IMG Activity: SIMG_CFMENUORKSOKTZ1

IMG Activity: SIMG_CFMENUORKSOKET1

IMG Activity: SIMG_CFMENU0KWMCPC1

IMG Activity: SIMG_CFMENU0KWMKCAM2

IMG Activity: SIMG_CFMENU0KWMKVB0

IMG Activity: SIMG_CFMENU0KWMCPC7

IMG Activity: SIMG_CFMENU0KWMKCAM

IMG Activity: SIMG_CFMENU0KWMCPP7

IMG Activity: SIMG_0KWM_KSES_PLAN

IMG Activity: SIMG_CFMENU0KWMXKA07

IMG Activity: SIMG_CFMENUORKSOKET

IMG Activity: SIMG_CFMENU0KWMXKK02

IMG Activity: SIMG_CFMENUORKSKBC3

IMG Activity: SIMG_CFMENUORKSKBC2

IMG Activity: SIMG_CFMENUORKSOKER

IMG Activity: SIMG_CFMENUORKSOKTZ

IMG Activity: SIMG_CFMENUORKSKA05

IMG Activity: SIMG_0KWM_PARAM_RPXN
Menu Path : Accounting → Controlling → Activity-Based Costing → Information System → Current Settings → Specify Report Currency

IMG Activity: SIMG_CFMENU0KWMOKLB

IMG Activity: SIMG_CFMENU0KWMGR5G

IMG Activity: SIMG_CFMENU0KWMFGRP

IMG Activity: SIMG_CFMENU0KWMOPMI
Menu Path : Accounting → Controlling → Activity-Based Costing → Information System → Current Settings → Import Models

IMG Activity: SIMG_0KWM_SELEK_RPBN
Menu Path : Accounting → Controlling → Activity-Based Costing → Information System → Current Settings → Selection Criteria

IMG Activity: SIMG_CFMENU0KWMSU02

IMG Activity: SIMG_0KWM_EWZYK_CMOD

IMG Activity: SIMG_CFMENU0KWMSU03

IMG Activity: SIMG_CFMENUORKSKR01

IMG Activity: SIMG_0KWM_EXTRA_GRE9
Menu Path : Accounting → Controlling → Activity-Based Costing → Information System → Current Settings → Settings for Extract Management

IMG Activity: SIMG_CFMENU0KWMGR21

IMG Activity: SIMG_CFMENU0KWMKBH2

IMG Activity: SIMG_CFMENU0KWMCPH2

IMG Activity: SIMG_CFMENUORKSOKV5

IMG Activity: SIMG_CFMENUORKSKAH21

IMG Activity: SIMG_CFMENUORKSOKVF

IMG Activity: SIMG_0KWM_INFO_KM3V

IMG Activity: SIMG_CFMENU0KWMGCRS2

IMG Activity: SIMG_0KWM_EWEP_CMOD

IMG Activity: SIMG_CFMENU0KWMOKWC
Menu Path : Accounting → Controlling → Activity-Based Costing → Information System → Current Settings → Generate Standard Reports

IMG Activity: SIMG_CFMENU0KWMGCRS

IMG Activity: SIMG_CFMENU0KWM0KW9

IMG Activity: SIMG_CFMENU0KWMKCAB2

IMG Activity: SIMG_CFMENU0KWMSBP

IMG Activity: SIMG_CFMENU0KWMCP85
Menu Path : Accounting → Controlling → Activity-Based Costing → Planning → Current Settings → Layout: Statistical Key Figures, Process

IMG Activity: SIMG_CFMENU0KWMKP34

IMG Activity: SIMG_CFMENU0KWMOKEZ

IMG Activity: SIMG_CFMENU0KWMOKEV2
Menu Path : Accounting → Controlling → Activity-Based Costing → Environment → Current Settings → Edit Versions

IMG Activity: SIMG_CFMENU0KWMXCP01

IMG Activity: SIMG_CFMENU0KWMKP81
Menu Path : Accounting → Controlling → Activity-Based Costing → Planning → Current Settings → Distribution Key

IMG Activity: SIMG_0KWM_ERGP_0KW3

IMG Activity: SIMG_CFMENU0KWMXKK01

IMG Activity: SIMG_CFMENU0KWMCPH3

IMG Activity: SIMG_CFMENU0KWMKBH3

IMG Activity: SIMG_CFMENU0KWMKBH4

IMG Activity: SIMG_0KWM_EWGP_CMOD

IMG Activity: SIMG_CFMENU0KWM0KWO

IMG Activity: SIMG_CFMENU0KWMCP65
Menu Path : Accounting → Controlling → Activity-Based Costing → Planning → Current Settings → Layout: Activity Inputs, Processes

IMG Activity: SIMG_CFMENU0KWMCP75
Menu Path : Accounting → Controlling → Activity-Based Costing → Planning → Current Settings → Layout: Quantities/Prices, Processes

IMG Activity: SIMG_0KWM_STAM_KM3V

IMG Activity: SIMG_0KWMKTPF_ZUORDN
Menu Path : Accounting → Controlling → Activity-Based Costing → Period-End Closing → Current Settings → Assign Templates for Cost Objects

IMG Activity: SIMG_CFMENU0KWM0KW1

IMG Activity: SIMG_0KWMCPT2_SCHEMA
Menu Path : Accounting → Controlling → Activity-Based Costing → Period-End Closing → Current Settings → Maintain Templates

IMG Activity: SIMG_CFMENU0KWMOKKP

IMG Activity: SIMG_0KWMKCAV1

IMG Activity: SIMG_0KWMCPV7

IMG Activity: SIMG_0KWMCPT2_UMGEBG

IMG Activity: SIMG_CFMENU0KWMXCPH2

IMG Activity: SIMG_0KWM0KW2_EIG

IMG Activity: SIMG_CFMENU0KWM0KWL

IMG Activity: SIMG_CFMENU0KWMKSOP

IMG Activity: SIMG_CFMENU0KWMXKK03

IMG Activity: SIMG_CFMENU0KWMKVB1

IMG Activity: SIMG_CFMENU0KWMCPH4

IMG Activity: SIMG_0KWM_FREMD_PL

IMG Activity: SIMG_CFMENU0KWMXP_V

IMG Activity: SIMG_0KWM_FREMD_IST

IMG Activity: SIMG_CFMENUORKSOKER1

IMG Activity: SIMG_CFMENUORKSOKTZ1

IMG Activity: SIMG_CFMENUORKSOKET1

IMG Activity: SIMG_CFMENUORKSOKET

IMG Activity: SIMG_CFMENUORKSKBC3

IMG Activity: SIMG_CFMENUORKSKBC2

IMG Activity: SIMG_CFMENUORKSOKER

IMG Activity: SIMG_CFMENUORKSOKTZ

IMG Activity: SIMG_CFMENUORKSKA05

IMG Activity: SIMG_CFMENUORKSKR01

IMG Activity: SIMG_CFMENUORKSOKV5

IMG Activity: SIMG_CFMENUORKSKAH21

IMG Activity: SIMG_CFMENUORKSOKVF

IMG Activity: SIMG_ORK2_SELVAR

IMG Activity: SIMG_CFMENUORK2KALI
Menu Path : Accounting → Controlling → Cost Element Accounting → Information System → Current Settings → Import Reports

IMG Activity: SIMG_CFMENUORK2GCRS

IMG Activity: SIMG_CFMENUORK2KAL8
Menu Path : Accounting → Controlling → Cost Element Accounting → Information System → Current Settings → Generate Reports

IMG Activity: SIMG_CFMENUORK2GCRS1

IMG Activity: SIMG_CFMENUORK2OKRS1

IMG Activity: SIMG_CFMENUORK2KSAZ

IMG Activity: SIMG_CFMENUORK2KALA

IMG Activity: SIMG_CFMENUORK2OBYB

IMG Activity: SIMG_CFMENUORK2OK13

IMG Activity: SIMG_ORK2_KALH_REGEL

IMG Activity: SIMG_ORK2_SELEK_RPAN
Menu Path : Accounting → Controlling → Cost Element Accounting → Information System → Current Settings → Define Selection Criteria

IMG Activity: SIMG_ORK2_EXTRA_GRE9
Menu Path : Accounting → Controlling → Cost Element Accounting → Information System → Current Settings → Determine Settings for Extract Managemen

IMG Activity: SIMG_CFMENUORK2OK19

IMG Activity: SIMG_CFMENUORK2SU03

IMG Activity: SIMG_CFMENUORK2SU02

IMG Activity: SIMG_ORK2_PARAM_RPXN
Menu Path : Accounting → Controlling → Cost Element Accounting → Information System → Current Settings → Specify Report Currency

IMG Activity: SIMG_CFMENUORK2GR21

IMG Activity: SIMG_CFMENUORK2OCMI
Menu Path : Accounting → Controlling → Cost Element Accounting → Information System → Current Settings → Import Templates

IMG Activity: SIMG_CFMENUORK2FGRP

IMG Activity: SIMG_CFMENUORK2GR5G

IMG Activity: SIMG_CFMENUORK2KALN

IMG Activity: SIMG_CFMENUORK2KAH2

IMG Activity: SIMG_CFMENUORK2OKA6

IMG Activity: SIMG_CFMENUORK2OKA4

IMG Activity: SIMG_CFMENUORK2OKEC

IMG Activity: SIMG_CFMENUORK2OKEK

IMG Activity: SIMG_CFMENUORK2OKB2

IMG Activity: SIMG_CFMENUORK2OKB3

IMG Activity: SIMG_CFMENUORK2SM35

IMG Activity: SIMG_CFMENUORK2KA02

IMG Activity: SIMG_ORK2_KM5V

IMG Activity: SIMG_CFMENUORK2KA01

IMG Activity: SIMG_CFMENUORK2KA021

IMG Activity: SIMG_ORK2_EWKRT_CMOD

IMG Activity: SIMG_CFMENUORK2AG_VF

IMG Activity: SIMG_XXMENUORK2_P_V

IMG Activity: SIMG_ORKAOPI1

IMG Activity: SIMG_ORKAKTPF_ZUORDN

IMG Activity: SIMG_CFMENUORK3OKE8

IMG Activity: SIMG_ORKACPT2_SCHEMA

IMG Activity: SIMG_CFMENUORK3OKE9

IMG Activity: SIMG_CFMENUORK30KWT

IMG Activity: SIMG_ORKACPT2_UMGEBG

IMG Activity: SIMG_CFMENUORK3OKC3

IMG Activity: SIMG_ORKAOKOV

IMG Activity: SIMG_CFMENUORKAKO021

IMG Activity: SIMG_CFMENUORK3OKC5

IMG Activity: SIMG_ORKAOKOG

IMG Activity: SIMG_CFMENUORK3OKC4

IMG Activity: SIMG_CFMENUORKACMODZ

IMG Activity: SIMG_CFMENUORK3OKE5

IMG Activity: SIMG_ORKAKK06

IMG Activity: SIMG_CFMENUORK3OKE6

IMG Activity: SIMG_ORKAOPIE

IMG Activity: SIMG_CFMENUORK3OKBF

IMG Activity: SIMG_ORKAOPIG

IMG Activity: SIMG_CFMENUORK3OKEX

IMG Activity: SIMG_ORKAKA06_VERZIN

IMG Activity: SIMG_CFMENUORK3OKE7

IMG Activity: SIMG_ORKAOPID

IMG Activity: SIMG_CFMENUORK3KPRN

IMG Activity: SIMG_ORKAKO02_ZINS

IMG Activity: SIMG_CFMENUORK3OKBC

IMG Activity: SIMG_ORKAOPIC

IMG Activity: SIMG_CFMENUORK3OKEP

IMG Activity: SIMG_ORKAOPIB

IMG Activity: SIMG_CFMENUORK3OKBG

IMG Activity: SIMG_ORKAOPIA

IMG Activity: SIMG_CFMENUORK3KAL1

IMG Activity: SIMG_ORKAOT03

IMG Activity: SIMG_ORKAOPIH

IMG Activity: SIMG_ORK3_GSCD

IMG Activity: SIMG_CFMENUORKAKBC4

IMG Activity: SIMG_ORK3_COEP_SM30

IMG Activity: SIMG_CFMENUORKAKBC1

IMG Activity: SIMG_CFMENUORK3OKC6

IMG Activity: SIMG_ORKAKAK2_I

IMG Activity: SIMG_CFMENUORK3OKO5

IMG Activity: SIMG_CFMENUORKAOKEP

IMG Activity: SIMG_CFMENUORKKKKPV

IMG Activity: SIMG_CFMENUORKAOKB9

IMG Activity: SIMG_CFMENUORKKKKE5

IMG Activity: SIMG_CFMENUORKAKANKI

IMG Activity: SIMG_CFMENUORK3OKBA

IMG Activity: SIMG_CFMENUORKAOK60

IMG Activity: SIMG_CFMENUORK3OKBB

IMG Activity: SIMG_ORKA_FMU1

IMG Activity: SIMG_CFMENUORK3OKEV1

IMG Activity: SIMG_CFMENUORKAOVA

IMG Activity: SIMG_CFMENUORK3OBA5

IMG Activity: SIMG_CFMENUORKAKBC2

IMG Activity: SIMG_CFMENUORK3OKC7

IMG Activity: SIMG_ORKAKGF4

IMG Activity: SIMG_CFMENUORK3OKC9

IMG Activity: SIMG_CFMENUORKAKZE2

IMG Activity: SIMG_CFMENUORKAKZM2

IMG Activity: SIMG_ORK3_OKBI_VERD

IMG Activity: SIMG_CFMENUORKAKZZ2

IMG Activity: SIMG_ORK38KEM

IMG Activity: SIMG_CFMENUORKAKZB2

IMG Activity: SIMG_CFMENUORK3OKKP

IMG Activity: SIMG_CFMENUORKAKZS2
Menu Path : Accounting → Controlling → Internal Orders → Period-End Closing → Current Settings → Maintain Costing Sheet

IMG Activity: SIMG_CFMENUORK3KANK

IMG Activity: SIMG_CFMENUORKAKA06

IMG Activity: SIMG_CFMENUORK3OKEQ

IMG Activity: SIMG_CFMENUORKAKOW1

IMG Activity: SIMG_CFMENUORK3SU03

IMG Activity: SIMG_CFMENUORKAKBC3

IMG Activity: SIMG_ORKA_TKKBH

IMG Activity: SIMG_CFMENUORK3SU02

IMG Activity: SIMG_ORKA_KKR0

IMG Activity: SIMG_ORK3SM30_WAEHR

IMG Activity: SIMG_ORKA_EXTRA_GRE9
Menu Path : Accounting → Controlling → Internal Orders → Information System → Current Settings → Determine Settings for Extract Managemen

IMG Activity: SIMG_ORK3OMX3

IMG Activity: SIMG_ORKA_SELEK_RPON
Menu Path : Accounting → Controlling → Internal Orders → Information System → Current Settings → Define Selection Criteria

IMG Activity: SIMG_ORK38KEP

IMG Activity: SIMG_ORKA_PARAM_RPXN
Menu Path : Accounting → Controlling → Internal Orders → Information System → Current Settings → Specify Report Currency

IMG Activity: SIMG_ORK3OMX2

IMG Activity: SIMG_CFMENUORKAOKL1

IMG Activity: SIMG_ORK3OMX1

IMG Activity: SIMG_CFMENUORKAGR5G

IMG Activity: SIMG_ORK3OMX6

IMG Activity: SIMG_CFMENUORKAFGRW

IMG Activity: SIMG_ORK3OKEQ_TRPR

IMG Activity: SIMG_CFMENUORKAORMI
Menu Path : Accounting → Controlling → Internal Orders → Information System → Current Settings → Import Templates

IMG Activity: SIMG_XXMENUORK3_AK

IMG Activity: SIMG_ORKA_ROLLUP_IS

IMG Activity: SIMG_CFMENUORKASU03

IMG Activity: SIMG_ORKAKOCM

IMG Activity: SIMG_XXMENUORKA_I_V

IMG Activity: SIMG_CFMENUORKATKKBH

IMG Activity: SIMG_CFMENUORKAOKRA

IMG Activity: SIMG_CFMENUORKAOKKD

IMG Activity: SIMG_CFMENUORKAKOT22

IMG Activity: SIMG_CFMENUORKACL00

IMG Activity: SIMG_CFMENUORKAOKRX

IMG Activity: SIMG_CFMENUORKAKO8N

IMG Activity: SIMG_CFMENUORKAOKOV1

IMG Activity: SIMG_CFMENUORKAOKO7

IMG Activity: SIMG_CFMENUORKAKEI1

IMG Activity: SIMG_CFMENUORKAOKEU

IMG Activity: SIMG_CFMENUORKAOKO6

IMG Activity: SIMG_CFMENUORKAABR

IMG Activity: SIMG_ORKACMOD_VERZIN

IMG Activity: SIMG_ORKAKANK_VERZIN

IMG Activity: SIMG_CFMENUORKAKAH21

IMG Activity: SIMG_CFMENUORKAGR21

IMG Activity: SIMG_CFMENUORKAGCRS1

IMG Activity: SIMG_CFMENUORKAOKOV2

IMG Activity: SIMG_ORKA_EWEP_CMOD

IMG Activity: SIMG_CFMENUORKAOKSA
Menu Path : Accounting → Controlling → Internal Orders → Information System → Current Settings → Generate Reports

IMG Activity: SIMG_CFMENUORKAGCRS

IMG Activity: SIMG_CFMENUORKAOKD6
Menu Path : Accounting → Controlling → Internal Orders → Information System → Current Settings → Import Reports

IMG Activity: SIMG_CFMENUORKAKBH21

IMG Activity: SIMG_CFMENUORKAKOH91

IMG Activity: SIMG_CFMENUORKAKOT21

IMG Activity: SIMG_CFMENUORKAOK10

IMG Activity: SIMG_CFMENUORKAKANK

IMG Activity: SIMG_CFMENUORKAOKC8

IMG Activity: SIMG_CFMENUORKAOKO9

IMG Activity: SIMG_ORKA_KO09_ALTDS

IMG Activity: SIMG_CFMENUORKACMOD

IMG Activity: SIMG_ORKASE71_DRUCK

IMG Activity: SIMG_CFMENUORKACL001

IMG Activity: SIMG_CFMENUORKAOKK1

IMG Activity: SIMG_CFMENUORKAKPH2
Menu Path : Accounting → Controlling → Internal Orders → Planning → Allocations → Current Settings → User-Defined Distribution Key

IMG Activity: SIMG_CFMENUORKAKP34

IMG Activity: SIMG_CFMENUORKAKPH5

IMG Activity: SIMG_CFMENUORKAKPG5

IMG Activity: SIMG_CFMENUORKAKBH22

IMG Activity: SIMG_CFMENUORKAKOH9

IMG Activity: SIMG_CFMENUORKAKAH2

IMG Activity: SIMG_CFMENUORKAKAK2

IMG Activity: SIMG_ORKASM34_LAYOUT

IMG Activity: SIMG_ORKAKOT2_FELD

IMG Activity: SIMG_ORKAKOT2_STATUS

IMG Activity: SIMG_CFMENUORKAKOV2

IMG Activity: SIMG_CFMENUORKABS52

IMG Activity: SIMG_CFMENUORKAOK02
Menu Path : Accounting → Controlling → Internal Orders → Master Data → Current Settings → Status Profiles

IMG Activity: SIMG_CFMENUORKAKONK

IMG Activity: SIMG_CFMENUORKAKOT2
Menu Path : Accounting → Controlling → Internal Orders → Master Data → Current Settings → Order Types

IMG Activity: SIMG_CFMENUORKAOKKP

IMG Activity: SIMG_CFMENUORKAOKO1

IMG Activity: SIMG_CFMENUORKAOKO8

IMG Activity: SIMG_CFMENUORKAOKOU

IMG Activity: SIMG_CFMENUORKAOKOL

IMG Activity: SIMG_CFMENUORKABS42

IMG Activity: SIMG_CFMENUORKAOKOR

IMG Activity: SIMG_CFMENUORKAOKOV

IMG Activity: SIMG_CFMENUORKASE11

IMG Activity: SIMG_CFMENUORKAKO02

IMG Activity: SIMG_ORKA_CPT2_UMG_P

IMG Activity: SIMG_CFMENUORKAOKOZ

IMG Activity: SIMG_CFMENUORKAKOW11

IMG Activity: SIMG_ORKA_KPR6

IMG Activity: SIMG_ORKA_BEW_VERS

IMG Activity: SIMG_ORKA_KALK_BEW

IMG Activity: SIMG_ORKA_BEW

IMG Activity: SIMG_ORKA_KALK

IMG Activity: SIMG_ORKA_CPT2_SCH_P

IMG Activity: SIMG_CFMENUORKSKSW1
Menu Path : Accounting → Controlling → Cost Center Accounting → Period-End Closing → Current Settings → Define Periodic Reposting

IMG Activity: SIMG_CFMENUORKAOK14

IMG Activity: SIMG_CFMENUORKSKOT21

IMG Activity: SIMG_CFMENUORKACJBN

IMG Activity: SIMG_ORKSSM34_LAY_I

IMG Activity: SIMG_CFMENUORKAOPTK

IMG Activity: SIMG_CFMENUORKSKO011

IMG Activity: SIMG_CFMENUORKAOKOC

IMG Activity: SIMG_CFMENUORKSKS031

IMG Activity: SIMG_CFMENUORKAOK111

IMG Activity: SIMG_CFMENUORKSKCAP2

IMG Activity: SIMG_CFMENUORKAOKOB

IMG Activity: SIMG_ORKSSM30_PERSKO

IMG Activity: SIMG_CFMENUORKAOKOA1

IMG Activity: SIMG_ORKSSM30_PERSAB

IMG Activity: SIMG_ORKA_KTPF

IMG Activity: SIMG_CFMENUORKSKK031

IMG Activity: SIMG_CFMENUORKAOK11

IMG Activity: SIMG_CFMENUORKSKVA2

IMG Activity: SIMG_ORKA_KPRI

IMG Activity: SIMG_CFMENUORKSKVD2

IMG Activity: SIMG_CFMENUORKAPL

IMG Activity: SIMG_ORKS_KZS2

IMG Activity: SIMG_CFMENUORKACKNR

IMG Activity: SIMG_ORKS_KZB2

IMG Activity: SIMG_ORKA_KPRK

IMG Activity: SIMG_ORKS_KZZ2

IMG Activity: SIMG_ORKA_KOND

IMG Activity: SIMG_ORKS_KZM2

IMG Activity: SIMG_XXMENUORKA_P_V

IMG Activity: SIMG_XXMENUORKA_PL_A

IMG Activity: SIMG_ORKS_KZE2

IMG Activity: SIMG_XXORKA_I_A

IMG Activity: SIMG_ORKS_KA06

IMG Activity: SIMG_CFMENUORKSKA012

IMG Activity: SIMG_CFMENUORKSKSAJ

IMG Activity: SIMG_CFMENUORKSKA013

IMG Activity: SIMG_CFMENUORKSKSAZI

IMG Activity: SIMG_ORKS_CMOD_ABGR

IMG Activity: SIMG_ORKS_KBC5

IMG Activity: SIMG_ORKS_KL01_ILV_P

IMG Activity: SIMG_CFMENUORKSKSC7
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Current Settings → Define Indirect Activity Allocation

IMG Activity: SIMG_CFMENUORKSOKES

IMG Activity: SIMG_CFMENUORKSOKEW

IMG Activity: SIMG_CFMENUORKSKCAL1

IMG Activity: SIMG_CFMENUORKSKCAU1

IMG Activity: SIMG_ORKS_KSES_PLAN

IMG Activity: SIMG_CFMENUORKSKSU7
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Current Settings → Define Assessment

IMG Activity: SIMG_CFMENUORKSKL02

IMG Activity: SIMG_CFMENUORKSOKB9

IMG Activity: SIMG_CFMENUORKSKBC1

IMG Activity: SIMG_CFMENUORKSKBC4

IMG Activity: SIMG_CFMENUORKSOK60

IMG Activity: SIMG_CFMENUORKSOKF1

IMG Activity: SIMG_CFMENUORKSSOVA

IMG Activity: SIMG_ORKS_FMU1

IMG Activity: SIMG_ORKS_KGF4

IMG Activity: SIMG_CFMENUORKSGCRS

IMG Activity: SIMG_CFMENUORKSOKB6
Menu Path : Accounting → Controlling → Cost Center Accounting → Information System → Current Settings → Generate Reports

IMG Activity: SIMG_ORKS_EWEP_CMOD

IMG Activity: SIMG_CFMENUORKSGCRS2

IMG Activity: SIMG_CFMENUORKSGR21

IMG Activity: SIMG_CFMENUORKSOKD3
Menu Path : Accounting → Controlling → Cost Center Accounting → Information System → Current Settings → Import Reports

IMG Activity: SIMG_CFMENUORKSKAH22

IMG Activity: SIMG_CFMENUORKSKSH21

IMG Activity: SIMG_CFMENUORKSKLH22

IMG Activity: SIMG_CFMENUORKSKBH22

IMG Activity: SIMG_ORKS_SELVAR

IMG Activity: SIMG_ORKS_EXTRA_GRE9
Menu Path : Accounting → Controlling → Cost Center Accounting → Information System → Current Settings → Determine Settings for Extract Managemen

IMG Activity: SIMG_CFMENUORKSSU03

IMG Activity: SIMG_ORKS_EWZYK_CMOD

IMG Activity: SIMG_CFMENUORKSSU02

IMG Activity: SIMG_ORKS_SELEK_RPCN
Menu Path : Accounting → Controlling → Cost Center Accounting → Information System → Current Settings → Define Selection Criteria

IMG Activity: SIMG_CFMENUORKSOKMI
Menu Path : Accounting → Controlling → Cost Center Accounting → Information System → Current Settings → Import Templates

IMG Activity: SIMG_CFMENUORKSFGRP

IMG Activity: SIMG_CFMENUORKSGR5G

IMG Activity: SIMG_CFMENUORKSOKLS

IMG Activity: SIMG_ORKS_PARAM_RPXN
Menu Path : Accounting → Controlling → Cost Center Accounting → Information System → Current Settings → Specify Report Currency

IMG Activity: SIMG_ORKS_KA06_UMIST

IMG Activity: SIMG_ORKS_KSES_IST

IMG Activity: SIMG_CFMENUORKSKSU1
Menu Path : Accounting → Controlling → Cost Center Accounting → Period-End Closing → Current Settings → Define Assessment

IMG Activity: SIMG_CFMENUORKSKL03

IMG Activity: SIMG_CFMENUORKSKCAL2

IMG Activity: SIMG_CFMENUORKSKCAU2

IMG Activity: SIMG_ORKS_KK06

IMG Activity: SIMG_ORKS_CMODZ

IMG Activity: SIMG_ORKS_KM1V_GKZ

IMG Activity: SIMG_CFMENUORKSKCAV2

IMG Activity: SIMG_CFMENUORKSKSV1
Menu Path : Accounting → Controlling → Cost Center Accounting → Period-End Closing → Current Settings → Define Distribution

IMG Activity: SIMG_CFMENUORKSOKA8
Menu Path : Accounting → Controlling → Cost Element Accounting → Actual Postings → Current Settings → Define Price Variances for Primary Data

IMG Activity: SIMG_ORKS_KL01_ILV_I

IMG Activity: SIMG_CFMENUORKSKSC1
Menu Path : Accounting → Controlling → Cost Center Accounting → Period-End Closing → Current Settings → Define Indirect Activity Allocation

IMG Activity: SIMG_CFMENUORKSOKES1

IMG Activity: SIMG_CFMENUORKSOKEW1

IMG Activity: SIMG_CFMENUORKSKK01

IMG Activity: SIMG_CFMENUORKSKPT1

IMG Activity: SIMG_CFMENUORKSCTU1

IMG Activity: SIMG_CFMENUORKSKBH2

IMG Activity: SIMG_CFMENUORKSKPR6

IMG Activity: SIMG_CFMENUORKS_VERS

IMG Activity: SIMG_CFMENUORKSKPR2

IMG Activity: SIMG_CFMENUORKS_ZUOR

IMG Activity: SIMG_CFMENUORKS_BEW

IMG Activity: SIMG_ORKSSM34_LAY_P

IMG Activity: SIMG_CFMENUORKSKOT2

IMG Activity: SIMG_CFMENUORKSKLH2

IMG Activity: SIMG_CFMENUORKSOKEE

IMG Activity: SIMG_CFMENUORKSKSW7
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Current Settings → Define Periodic Reposting

IMG Activity: SIMG_CFMENUORKSKCAP1

IMG Activity: SIMG_CFMENUORKSOKEI

IMG Activity: SIMG_ORKS_EWLRT_CMOD

IMG Activity: SIMG_CFMENUORKSKPU1

IMG Activity: SIMG_CFMENUORKSOB08
Menu Path : Accounting → Controlling → Cost Element Accounting → Planning → Current Settings → Specify Exchange Rates

IMG Activity: SIMG_CFMENUORKSKP85

IMG Activity: SIMG_CFMENUORKSKP75

IMG Activity: SIMG_CFMENUORKSOKEV
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Current Settings → Maintain Versions

IMG Activity: SIMG_CFMENUORKSKP65

IMG Activity: SIMG_CFMENUORKSKBH21

IMG Activity: SIMG_CFMENUORKSKAH2

IMG Activity: SIMG_CFMENUORKSKSH2

IMG Activity: SIMG_CFMENUORKSKLH21

IMG Activity: SIMG_CFMENUORKS_KALK

IMG Activity: SIMG_CFMENUORKS_KOND

IMG Activity: SIMG_CFMENUORKSKPRK

IMG Activity: SIMG_CFMENUORKSKPRI

IMG Activity: SIMG_CFMENUORKSOKY8

IMG Activity: SIMG_CFMENUORKSOB07

IMG Activity: SIMG_CFMENUORKSOKY4

IMG Activity: SIMG_CFMENUORKSKP81
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Current Settings → Create User-Defined Distribution Keys

IMG Activity: SIMG_CFMENUORKSKP34
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Current Settings → Create User-Defined Planner Profiles

IMG Activity: SIMG_CFMENUORKSKSH3

IMG Activity: SIMG_CFMENUORKSKPHR

IMG Activity: SIMG_CFMENUORKSOKEA

IMG Activity: SIMG_CFMENUORKSOKEG

IMG Activity: SIMG_CFMENUORKSKK03

IMG Activity: SIMG_ORKS_COPY_CMOD

IMG Activity: SIMG_CFMENUORKSKSAZ

IMG Activity: SIMG_ORKS_KM1V

IMG Activity: SIMG_CFMENUORKSOKOZ

IMG Activity: SIMG_ORKS_ERKOS_0KM1

IMG Activity: SIMG_CFMENUORKSKS02

IMG Activity: SIMG_CFMENUORKSOKEO

IMG Activity: SIMG_CFMENUORKSOMIK

IMG Activity: SIMG_CFMENUORKSAR13

IMG Activity: SIMG_CFMENUORKSKA04

IMG Activity: SIMG_CFMENUORKSKA01

IMG Activity: SIMG_ORKS_KM7V

IMG Activity: SIMG_CFMENUORKSKS03

IMG Activity: SIMG_CFMENUORKSKO01

IMG Activity: SIMG_CFMENUORKSKVD0

IMG Activity: SIMG_CFMENUORKSKL01

IMG Activity: SIMG_CFMENUORKSKVA0

IMG Activity: SIMG_ORKS_EWKOS_CMOD

IMG Activity: SIMG_CFMENUORKSOKA2

IMG Activity: SIMG_CFMENUORKSKA011

IMG Activity: SIMG_CFMENUORKSOKKP

IMG Activity: SIMG_CFMENUORKSKCAV1

IMG Activity: SIMG_CFMENUORKSKSV7
Menu Path : Accounting → Controlling → Cost Center Accounting → Planning → Current Settings → Define Distribution

IMG Activity: SIMG_XXMENUORKS_PL_A

IMG Activity: SIMG_XXMENUORKS_P_V

IMG Activity: SIMG_XXORKS_I_A

BCT-CO: Change Report Row Hierarchy

BCT-CO: Displ/Check Report Row Hier.

Program Trace

Actual Overhead: Sales Order
Menu Path : Logistics → Materials Management → Foreign Trade/Customs → General Foreign Trade Processing → Environment → Sales – Export → Sales → Quotation → Subsequent Functions → Calculate Surcharges

Actual Settlement: Sales Orders
Menu Path : Logistics → Materials Management → Foreign Trade/Customs → General Foreign Trade Processing → Environment → Sales – Export → Sales → Quotation → Subsequent Functions → Settlement

Commit. carried forwrd: Sales orders
Menu Path : Logistics → Materials Management → Foreign Trade/Customs → General Foreign Trade Processing → Environment → Sales – Export → Sales → Product Cost by Sales Order → Year-End Closing → Commitment Carryforward

Actual Reval.: Sales Order
Menu Path : Logistics → Materials Management → Foreign Trade/Customs → General Foreign Trade Processing → Environment → Sales – Export → Sales → Product Cost by Sales Order → Period-End Closing → Single Functions → Revaluation at Actual Prices

Maintain Allocation Structure

Click here to know details about SAP standard tables used with Overhead Cost Controlling in CO.